My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2025 SELECT BOARD Minutes (2)
>
12/08/2025 SELECT BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 10:19:09 AM
Creation date
2/10/2026 10:18:18 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
12/08/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Select Board <br />December 8,2025 <br />Minutes <br /> <br />be possible to add parallel parking near the courts and explained that one of the four existing <br />parking aisles would be eliminated under the current design. <br /> <br />Selectman Cotton agreed with the concern and suggested exploring additional parking on <br />the east side of the lot, possibly with angled spaces. <br /> <br />Selectman Weeden raised a question about relocating the portable restroom closer to the <br />beach and expressed concern about potential odor impacts. Selectman Weeden also noted <br />that the relocation of the portable restroom may result in the loss of one or two parking <br />spaces. Laurent explained that the relocation was intended to improve user safety and <br />accessibility. <br /> <br />Laurent noted the layout in the upper right portion of the lot by realigning boulders on the <br />eastern side to create a more defined entrance and to slow vehicle tra?ic as it approaches <br />the beach. <br /> <br />Chair Wyman-Colombo asked Catherine Laurent to return with revised concepts showing <br />potential locations for additional parking for further Board review. <br /> <br />Presentation on Great Neck Road North and Route 130 Roundabout <br />Catherine Laurnt presented to the Select Board on the proposed Great Neck Road North and <br />Route 130 roundabout project. Laurent explained that the project originated in December <br />2021, when the Board voted to replace the existing tra?ic signal with a roundabout. <br /> <br />The intent of the project is to improve the overall level of service at the intersection by <br />allowing continuous vehicle movement rather than stopping tra?ic at a signal. The <br />presentation reflected a design development plan, which has been coordinated with Phase <br />II of the Town’s wastewater project scheduled to begin within the next year. Engineering sta? <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.