Laserfiche WebLink
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APEALS <br /> MARCH 25, 2026 <br /> The Board is entitled to retain outside consultants to review material submitted by <br /> the applicant during the public hearing process. Attorney Haverty suggested that <br /> the Board do so. This is a very technical process, and the Board may or may not <br /> have the capacity within its members to review this application, and the Board has <br /> the right to require the applicant to fund the peer review of multiple disciplines <br /> including civil, storm water, architectural review, traffic review, etc. <br /> The applicants' team is aware of the concerns that have been raised with the Town <br /> Departments, and comments from abutting property owners regarding issues such <br /> as building height, fire safety access, traffic impact, and storm water concerns. <br /> Attorney Haverty is aware that these issues will be reviewed in depth throughout <br /> the hearing process, and commit to working with the Board, and that the concerns <br /> are addressed throughout the hearing process. <br /> Mr. Chris Mulhern, Architect, provided the Board with a power point presentation <br /> that included a rendering of the building, the proximity of the building, landscaping <br /> and material. He said that some adjustments were made to the drawings to reflect <br /> the comments that were made by Town Boards earlier on in this project. The <br /> building is four stories. The units range from 535 sq. ft. to 1,250 sq. ft.; there's <br /> about 4,000 sq. ft. of amenity space in the building, with 96 surface parking spaces. <br /> The mix of the units includes studios, one bedroom, two bedrooms, and three- <br /> bedroom units, for a total of 65 units. The elevations with gable ended bays with <br /> recessed balconies. The parking lot side of the L-shaped building is where the main <br /> entrance will be, and beyond the main entrance is outdoor amenity area for the <br /> tenants. The ground level units will have fencing around them, and the balconies <br /> on the upper levels. The building material will have clapboard products, asphalt <br /> shingles on the roof, and vinal-tilt windows with low-E glass situated on brick on <br /> the upper units and cast stone on the ground level. <br /> Mr. Mulhern said that revisions were made to the front entrance from the inside <br /> corner to the long side of the building to provide a better connection to the drop-off <br /> area and handicapped area. A second elevator was added to the building to provide <br /> more access to all the units. There are two elevators in the building. There is also a <br /> third stairway to the building. Each wing has a fire exit stairway. The floor plan <br /> slide in yellow described the amenities to include a tenant lounge, a wine <br /> room/shared kitchen, a gym, yoga studio, and a conference room. There is also a <br /> shared patio for the tenants. The roof plan was revised from a full gable room to a <br /> partial gable edge and a flat room in the middle with roof drains and HVAC. The flat <br /> roof is accessible by stairs. The heigh of the building was reduced from 56 ft. to 53 <br /> ft. on Falmouth Rd. side, and to 40 ft. on the parking lot side. The building is 3 <br /> stories on the parking lot side at 40 ft., and 4-story building at 53 ft. from the <br /> Falmouth Rd side. <br /> 15 <br />