Laserfiche WebLink
Circulation <br /> Considering the storm outages, the stats remained high for the month of <br /> February. <br /> Building and Grounds <br /> The DPW did a great job plowing everything after the storm. The building lost <br /> power from Monday-Thursday, and the building remained closed, as most of <br /> town was without power. Power came back late Wednesday night. <br /> The Library Director is getting quotes for new self-checkout devices, as the <br /> current ones require updating. <br /> Event Room <br /> The Event Room projector is still not operating. A backup projector can be used <br /> for now. Atechnicianfrom the original vendorassessed the current projector and <br /> will create a quote to consider replacing the current projector rather than <br /> repairing it. The Library Director estimated that the cost for a new projectorwould <br /> be close to $10,000 for the entire project. <br /> Budget <br /> The Library Director presented the Library budget to Town Officials. Departments <br /> are submitting budgets to maintain existing service levels. The Town will be <br /> seeking approval to seek an override in light of upcoming wastewater/sewer <br /> project,which is an essential need of the town, as well as the new Police Station. <br /> If the override passes, the budget will be funded as submitted. If the override <br /> does not pass, the secondary budget will be in effect with restrictions, and each <br /> Departmentwill have reductions by a certain percentage. The secondary budget <br /> cut for the library would be $13,942, which would have an impact, but is <br /> manageable. <br /> 2 <br />