My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/19/2025 UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS Minutes (2)
>
11/19/2025 UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 5:04:16 PM
Creation date
4/27/2026 12:23:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS
Meeting Document Type
Minutes
Meeting Date
11/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Other repairs (e.g., replacing footings or columns) depend on outcomes of structural <br /> analysis. <br /> • Ongoing discussion whether additional operational restrictions (e.g., limits on occupancy <br /> during snow events) may be needed before repairs are completed. Structural analysis will <br /> provide specifics on snow/load capacity and recommendations for operational limits <br /> during risky weather. <br /> 4. Jurisdictional/Regulatory Clarifications <br /> • Confusion regarding which town's building inspector presides due to the facility's <br /> location (state land on federal reservation; underlying property in Sandwich but <br /> Falmouth, Mashpee, and state all have been involved). <br /> • Consensus: State Building Inspector is the authority. <br /> • Confirmation that building-related permits and inspections for structural repairs must be <br /> coordinated at the state level, <br /> 5. Follow-ups & Next Meetings <br /> • December 842: Structural reports from Weston & Sampson to be circulated for board <br /> review. <br /> • December 15, 2025, at 9:00 AM: Next official meeting to discuss the structural report <br /> findings and finalize direction for RFP and repair schedule, <br /> • Further reach-outs and coordination with Mark Lapointe (State Building Inspector) to <br /> confirm inspection timing and application needs. <br /> • Monitoring progress on potential contract extension with current operator. <br /> • Addendum #2 to the RFP must be published and communicated to all bidders by <br /> November 21 at latest. <br /> Meeting adjourned at 10:00 AM. <br /> Respectively sbbmitted, <br /> Meaghan Jackimowicz <br /> Mashpee Department of Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.