My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/26/2026 SELECT BOARD Minutes (2)
>
01/26/2026 SELECT BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 10:40:37 AM
Creation date
5/4/2026 10:39:48 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
01/26/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Select Board <br />January 26, 2026 <br />Minutes <br />Selectwoman Wyman-Colombo-yes <br />Selectman Weeden-yes <br />Selectman Cotton-yes <br />Selectwoman Kelley-Wilson-yes <br />Selectman Richardson- yes <br />APPOINTMENTS & HEARINGS <br /> <br />Catherine Laurent, DPW Director <br /> Review of Recommendation for Award of Contract for Mashpee-Wakeby Boat <br />Ramp Stormwater Improvements <br />Catherine Laurent, DPW Director, recommended awarding the contract to Lawrence Lynch <br />Corp. of Falmouth, MA, in an amount not to exceed $800,367.00, as the lowest qualified <br />bidder. <br />Motion made by Selectman Weeden to award the contract for the Mashpee–Wakeby <br />Boat Ramp Stormwater Improvements to Lawrence Lynch Corp. <br />Motion seconded by Selectman Cotton. <br />Vote: 5-0 Unanimous <br />Roll Call Vote <br />Selectwoman Wyman-Colombo-yes <br />Selectman Weeden-yes <br />Selectman Cotton-yes <br />Selectwoman Kelley-Wilson-yes <br />Selectman Richardson- yes <br /> Presentation of Updated Plans for Proposed Stormwater Improvements to <br />Attaquin Park <br />The Select Board reviewed updated plans for the proposed stormwater improvements at <br />Attaquin Park, following discussion at the December 8 meeting. DPW Director, Catherine <br />Laurent, reported that the plans were revised with the project engineer to increase parking <br />to 41 spaces, three fewer than the current count, and to reduce parking space widths to <br />the minimum allowed by Town bylaw. Portable toilets were relocated to address <br />pedestrian safety concerns and reduce the need for users to cross the parking lot. No <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.