My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2026 CONSERVATION COMMISSION Minutes
>
05/07/2026 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2026 5:00:46 PM
Creation date
6/15/2026 10:53:55 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/07/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Several Commission members acknowledged the revisions and reductions incorporated into the proposal,including <br /> significant decreases in lawn area, increased native mitigation plantings, and use of pervious materials. It was also stated <br /> that the applicant had addressed the Commission's prior requests and that further policy discussion regarding nitrogen <br /> standards and groundwater protection may be more appropriately addressed during future Commission workshops or <br /> quarterly meetings rather than within the scope of the current hearing. <br /> Discussion concluded with reference to standard mitigation and planting conditions, including recommendation for a <br /> two-year mitigation monitoring requirement. <br /> MOTION: To close an issue on 31 Nick Trail. <br /> Motion by: Seana Pitt Seconded by: Steve Cook <br /> Vote: Tie vote and therefore failed. <br /> Aye: Steve Cook, Seana Pitt <br /> Nay: Paul Colombo, Sandi Godfrey <br /> Following the failed 2-2 vote on the Notice of Intent for 31 Nick Trail, discussion occurred regarding quorum <br /> requirements and participation by Commissioners who had missed prior hearings. It was stated that Mullen forms had <br /> been completed for absent members in order to allow participation in deliberations. The applicant's representatives then <br /> asked whether there were additional measures that could be taken to secure approval of the project, stating that all <br /> requested revisions and mitigation measures had already been completed. Discussion focused primarily on the nitrogen <br /> loading issue that had resulted in the split vote. It was stated that the existing approved septic system remained the <br /> principal factor contributing to the nitrogen calculations and that achieving a nitrogen concentration below ten parts per <br /> million would not be possible with the approved system currently in place. Representatives for the applicant argued that <br /> the project already represented a significant improvement over existing conditions through reduced lawn area, additional <br /> landscaping, dry wells, flood-compliant construction, and overall reductions in nitrogen loading compared to existing <br /> site conditions. It was further stated that the project complied with applicable local regulations establishing a 19 <br /> milligrams-per-liter threshold for the type of residential project proposed. Additional discussion addressed whether <br /> installation of a different denitrifying septic system could further reduce nitrogen loading calculations. It was <br /> acknowledged that use of a different septic technology could potentially lower nitrogen levels, although it was stated <br /> that such changes were outside the scope of the current Notice of Intent because the septic system had already been <br /> separately approved. Concern was also expressed that the septic technology originally approved for the property was no <br /> longer accepted by the Town or DEP for denitrification purposes. <br /> The property owner addressed the Commission and expressed frustration regarding what was described as inconsistent <br /> application of nitrogen standards compared to other recently approved raise-and-replace projects within the same <br /> neighborhood. It was stated that the applicant had complied with all prior Commission requests, including reductions in <br /> lawn area,increased landscaping,use of pervious materials, and other mitigation measures,yet was now being asked to <br /> satisfy a nitrogen standard that had not previously been applied to comparable projects. The applicant further stated that <br /> substantial time and expense had already been invested in engineering,landscaping, and permitting efforts in reliance on <br /> prior septic system approvals. <br /> Further discussion occurred regarding interpretation of local regulations governing groundwater protection and <br /> cumulative adverse effects.It was stated that recently approved projects in the area generally utilized denitrifying <br /> systems and produced lower nitrogen loading calculations than the subject proposal. Discussion also addressed the fact <br /> that the originally approved septic technology was no longer accepted for new approvals as of March 1,2026.The <br /> applicant's representatives maintained that the project remained compliant with applicable bylaws and regulations in <br /> effect for the proposal and argued that standards should be applied consistently among similarly situated projects. <br /> Discussion concluded with the applicant requesting a continuance in order to further evaluate potential options for <br /> reducing nitrogen loading calculations and addressing the Commission's remaining concerns. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.