Laserfiche WebLink
I <br /> Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Maslipee, MA 02649 <br /> MOTION: To continue 31 Nick Trail to May 21, 2026. <br /> Motion b Sandi Godfrey Seconded by: Seana Pitt <br /> Vote: Motion passed unanimously by roll call vote. <br /> Steve Cook,Paul Colombo, Sandi Godfrey, Seana Pitt <br /> NOI 68 Waterway, Robert C. & Beth Ann Junkin. Proposed demolition of the existing dwelling <br /> and reconstruction of a new flood compliant dwelling in the same footprint. <br /> (Representative: Cape & Islands Engineering, Inc.) (cont. 4.23) 43- <br /> 3413 <br /> The applicant's representative reviewed revisions made in response to prior Commission comments, including <br /> incorporation of record groundwater elevation data associated with the existing septic system, redesign of the <br /> proposed dry well system to provide greater separation to groundwater, reduction of lawn areas within <br /> jurisdictional areas, updated nitrogen loading calculations, removal of a proposed shed, and shifting of the <br /> proposed house farther from the water in order to offset the addition of stairs required for building code <br /> compliance. It was further stated that existing stone walkways would be reduced and replaced with a single <br /> walkway, while the existing gravel driveway would remain unchanged. <br /> Discussion focused extensively on lawn calculations, groundwater elevations, stormwater management, and <br /> nitrogen loading calculations associated with the project. Clarification was provided regarding differences <br /> between lawn calculations used for nitrogen loading analyses and calculations used for compliance with local <br /> lawn area limitations under Regulation 31. Questions were also raised regarding the basis for the groundwater <br /> elevation data used in designing the revised dry well system and whether sufficient supporting documentation <br /> had been provided. Commissioners requested additional drainage calculations and stormwater design <br /> information, including contributing roof areas, infiltration rates, design storm calculations, and drawdown <br /> analyses, noting that such information should become standard submittal material for future projects. <br /> Additional discussion addressed inconsistencies in the project narrative regarding whether the property was <br /> located within a Zone 11 wellhead protection area. It was stated that the narrative incorrectly indicated the <br /> property was not located within such an area, while GIS mapping confirmed that the property was located <br /> within a wellhead protection zone associated with the Town's drinking water supply. Concern was expressed <br /> regarding cumulative groundwater impacts and nitrogen loading levels in relation to local groundwater <br /> protection regulations. Discussion also addressed broader concerns regarding protection of drinking water <br /> resources, evolving regulatory standards, and the need for consistent application of nitrogen-related review <br /> criteria among projects appearing before the Commission. <br /> Commissioners further discussed deficiencies in existing site landscaping and previously approved mitigation <br /> plantings associated with an earlier 2007 approval for the property. It was stated that portions of the <br /> previously approved planting plan had not been implemented and that existing conditions included minimal <br /> vegetation and an unauthorized fire pit and seating area adjacent to the bulkhead. Discussion occurred <br /> regarding requiring restoration of the prior approved planting areas as a condition of approval. Additional <br /> discussion addressed whether certain drainage and planting issues could be addressed through conditions or <br /> whether further information should be provided before the Commission made a decision on the application. <br /> Further discussion focused on how the Commission should evaluate cumulative adverse impacts, consistency <br /> among prior project approvals, and balancing environmental improvements against existing noncompliant <br /> conditions. It was stated that while the proposed project represented a substantial improvement over existing <br /> conditions, Commissioners remained obligated to evaluate whether the applicant had demonstrated <br /> compliance with local regulations governing cumulative adverse impacts to groundwater resources. It was <br />