My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2026 CONSERVATION COMMISSION Minutes
>
06/11/2026 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 5:00:37 PM
Creation date
7/14/2026 2:02:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/11/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> NOI 17 Sunset Circle, Eric L. Coelho. Proposed removal of the existing timber wall and replacement <br /> with a new vinyl sheet pile wall, permit the existing pier, and install native vegetation plantings. <br /> (Representative: Cape and Islands Engineering, Inc.) (cunt.4.23/5.07) 43- <br /> 3414 <br /> Chuck Rowland of Cape and Islands Engineering appeared on behalf of the applicant. Mr. Rowland stated <br /> that revised plans and a response letter had been submitted addressing comments raised at prior hearings. <br /> Mr. Rowland explained that the revised plan added drainage for the walkway, additional information <br /> regarding seasonal water depths, and boat information. The proposed walkway drainage would consist of a <br /> gravel trench drain designed to intercept runoff from the dry-laid paver walkway before it enters the lake. <br /> The pier was shown at 50 feet in length in order to provide sufficient depth for the applicant's motorized boat <br /> during seasonal low-water conditions. Mr. Rowland stated that the previously approved/licensed pier was 32 <br /> feet long,but the proposed 50-foot length was needed based on the boat draft and observed lake elevations. <br /> He noted that several nearby docks are of similar length, and some are longer. Mr. Rowland stated that the <br /> pier decking would be timber, which was a change from the project narrative discussed at the prior hearing. <br /> He further stated that the pier would be seasonally deployed and stored beneath the deck during the off- <br /> season. He explained that the dock sections would be installed by hand, with two people walking the sections <br /> into the water and placing them on small footings. Mr. Rowland also reviewed the Natural Heritage and <br /> Endangered Species Program correspondence and stated that the applicant could comply with the suggested <br /> conditions. He noted that NHESP objected to purple flowering raspberries in the planting plan, and he stated <br /> that he would remove that species from the plan if requested by the Commission. <br /> The Commission discussed the proposed seasonal dock, including the need for the 50-foot length, the boat <br /> location shown on the plan, and whether low-water conditions would be relevant if the dock is seasonal. The <br /> applicant explained that water depths were based on the surveyed lake elevation and that low-water conditions <br /> can occur in summer as well as winter. Discussion also focused on the NHESP freshwater mussel protection <br /> requirements. Questions were raised regarding the mussel protection plan, including when the survey would <br /> occur and whether the Commission would review the plan before voting. Staff explained that the NHESP <br /> conditions could be incorporated into the Order of Conditions and would require the appropriate survey and <br /> reporting before construction. Staff further explained that qualified professionals recognized by NHESP <br /> conduct freshwater mussel surveys and, if mussels are present within the dock footprint, they may be <br /> relocated or additional conditions may be required. The Commission also discussed whether a negative <br /> mussel survey or a finding of numerous mussels could affect the project. Staff stated that the project would <br /> not proceed until any required NHESP conditions were satisfied and noted that, in some cases, additional <br /> measures such as permanent footings may be required to ensure a seasonal dock is installed in the same <br /> location each year. Staff noted that the area of Johns Pond in question has a rocky and gravelly substrate, <br /> which is not generally conducive to large freshwater mussel populations, although mussels could still be <br /> present. <br /> Questions were also raised regarding off-season storage and seasonal installation/removal of the dock. The <br /> applicant stated that the dock components would be stored under the deck and that installation/removal would <br /> involve minimal disturbance, similar to typical seasonal dock deployment. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.