My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/15/2026 PLANNING BOARD Minutes
>
07/15/2026 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 5:03:35 PM
Creation date
8/20/2026 8:37:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of TMs s,s <br /> z. <br /> Aannin Board <br /> c� <br /> 16 Great Neck Road North <br /> .wlashpee, Aassachusetts 02649 <br /> Ms. Christy stated now it is a safety concern. If the public is not being prevented from using it, <br /> that needs to be prevented. <br /> Mr. Tobin will reach out to Dave Morris, Building Commissioner, and see what can be done. <br /> Mr. Balzarini inquired about the lines at Ken Marsters property. <br /> Mr. Tobin will also follow up with Mr. Marsters. <br /> Mr. Hansen commented on this property, where they added signage, the right-hand post has a <br /> stop sign on it. That same pole could be utilized to say, `Do Not Enter', he thinks that would be <br /> a no brainer. <br /> Mr. Balzarini agreed, people will think that's the entry for the property. <br /> Mr. Balzarini, Mr. Tobin, and Mr. Hansen will arrange a meeting with Mr. Marsters. <br /> OLD BUSINESS <br /> Willow Circle Final Tripartite Release <br /> Mr. Tobin noted the Board Engineer has signed off on the final performance at the Willow <br /> Circle subdivision and is good to release the remaining balance. He went ahead and had a <br /> conversation with DPW Director Catherine Laurent. There is an e-mail from Ms. Laurent saying <br /> the DPW is okay with the current standing. This was a 5 or 6 lot subdivision that this Board <br /> previously released the covenant for a couple years ago, approving a Tripartite Agreement in <br /> its place. The tripartite agreement's amount has been reduced at various installments pursuant <br /> to said agreement. The third installment was released in 2025 and this would be the final <br /> release. <br /> Ed Pesce, former Board Engineer, did signoff under his inspection. There is a copy of the <br /> release for signature. <br /> MOTION: <br /> Dennis Balzarini made a motion to take a six-minute recess. Seconded by Mike <br /> Millbury. All in favor. <br /> The meeting resumed and Ms. Waygan looked at the release and the tree replacement for <br /> Mrs. Carol Souza. <br /> Mr. Tobin took the Board through the recorded plan and what lots pertained in the tripartite. <br /> There is a note to the file where he added Carol Souza's comment about everything looking <br /> good for Lot 1 Willow Circle. There is an e-mail from Ed Pesce noting everything looks good, <br /> along with photos, after he inspected the remaining punch list items.. The project is considered <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.