My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/06/2026 CONSERVATION COMMISSION Minutes
>
08/06/2026 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2026 5:00:35 PM
Creation date
9/8/2026 11:32:09 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/06/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> that the stream was not identified on either the USGS or MassDEP mapping, Mr. Colombo stated that this addressed his <br /> concern because those maps could be used as evidence when making the determination during drought conditions. <br /> The Commission discussed the direction of flow, identified as predominantly north to south, and whether reopening the <br /> culvert could transport sediment or other material downstream to wetlands. Mr. Bracken stated that enlarging the culvert <br /> would represent an overall improvement, allowing the former Besse Bog area to drain toward a wetland farther south <br /> and improving habitat and infiltration. The project was also intended to improve aquatic and terrestrial organism <br /> passage. <br /> Discussion addressed the planned road closure during construction. It was explained that maintaining a lane of traffic <br /> during the culvert replacement would be problematic and would extend the project duration. Similar closures had been <br /> used for other Town culvert projects. The culvert replacement itself was anticipated to require a road closure of less than <br /> a month, while the overall project was expected to take approximately three to four months. The schedule would also be <br /> coordinated with gravity sewer construction and a nearby pump station project. The Commission discussed the <br /> identification of the properties as 0 Hollow Road and 0 South Sandwich Road and reviewed the property lines shown on <br /> the plans. Hollow Road was identified as a paper road, while the dirt hiking trail discussed during the review was <br /> clarified as Goodspeed Road. The 0 Hollow Road parcel was described as an irregularly shaped parcel identified as such <br /> on the assessor's map, and 0 South Sandwich Road was identified as the property across the roadway. <br /> Further discussion addressed the limits of work and the adjoining 310 and 311 Main Street properties. The culvert itself <br /> would be located entirely within the right-of-way,with erosion controls within an existing drainage easement. The <br /> applicant stated that the limits of work had been established to avoid work on adjoining private property. <br /> The Commission questioned whether restoring flow through the larger culvert would result in additional water entering <br /> the unnamed tributary on the 310 Main Street property and whether authorization from that property owner was <br /> necessary. The applicant explained that the tributary already existed and historically received intermittent flow, and that <br /> the project was not creating additional water or introducing a new flow path. Rather, the existing culvert had collapsed <br /> and filled with sediment,preventing the historic intermittent flow, and the project would reestablish that pathway. The <br /> proposed erosion controls were within an existing easement, and the adjoining property owner had been notified as an <br /> abutter. <br /> Staff further noted that Besse Bog did not currently drain into the culvert because vegetation,rocks and boulders <br /> substantially obstructed the former bog and culvert area. Any water passing through the improved culvert would <br /> encounter dense vegetation along the downstream ditch. Staff expressed no concerns with the proposal and stated that <br /> the project would improve both the culvert and the area in connection with the Town's other planned infrastructure <br /> improvements. <br /> MOTION: Close and issue at 0 Hollow Road/ 0 South Sandwich Road (Besse Bog), Town of <br /> Mashpee, with no conditions. <br /> Motion by: Richard Sahl Seconded by: Seana Pitt <br /> Vote: Vote passed unanimously by roll call vote <br /> Steve Cook, Paul Colombo, Richard Sahl, Seana Pitt <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.