My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-BOARD OF HEALTH
TownOfMashpee
>
Town Clerk
>
Minutes
>
BOARD OF HEALTH
>
2000-2009
>
2001
>
2001-BOARD OF HEALTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:54 PM
Creation date
11/17/2016 3:22:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
12/31/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES May 31, 2001 4 BOARD OF HEALTH <br /> 5. Emergency Repair Certifications: <br /> 9 Fairway Knob <br /> Ms. Warden indicated that the leach pit is full to overflowing and that the <br /> installation of 2 500-gallon drywells, a new distribution box with 4'of stone is <br /> necessary. H2O covers and schedule 40 piping are required as the system will <br /> be in the driveway. <br /> Board members forwarded their signatures to the emergency failure certification <br /> form. <br /> 90 Quinaquisset Avenue <br /> Health Consultant Charlotte Stiefel indicated that the leach pit is full to the top. <br /> Board members forwarded their signatures to the emergency failure certification <br /> form. <br /> 50 Rainbow Lane <br /> Health Consultant Charlotte Stiefel indicated that the leach pit was pumped <br /> less than a month ago and that it is almost full again (less than 1' capacity <br /> remaining). <br /> Board members forwarded their signatures to the emergency failure certification <br /> form. <br /> 6. Request for Food Establishment License: Cotuit Pizza <br /> Ms. Warden stated that Cotuit Pizza Factory, Inc. is requesting a 2001 Seasonal <br /> Food Establishment permit for their new location in the Popponesset <br /> Marketplace (formerly Marketplace Pizza). She stated that an inspection has <br /> been performed at the establishment and no violations were found. <br /> Mr. Santos motioned to grant a 2001 Seasonal Food Establishment permit for <br /> Cotuit Pizza Factory, Inc. Mr. Ball seconded the motion. Motion passed. <br /> 7. Cape Cod Commission Report re: New Seabury Development <br /> Board acknowledged. <br /> 8. Variance request: 63 Riverside Road <br /> The applicant is requesting a 1'variance from the bottom of the soil absorption <br /> system to the high groundwater elevation. Discussion took place regarding the <br /> design. Board members expressed their concern over the lack of a reserve on <br /> the plan and the fact that flow diffusers would be a better alternative than the <br /> drywells shown. Ms. Warden further indicated that she would not sign an <br /> occupancy permit until a new system was installed. <br /> Mr. Ball motioned to deny the request by Cape 8s Islands Engineering outlined <br /> in their cover letter dated May 23, 2001. Mr. Santos seconded the motion. <br /> Motion to deny passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.