Laserfiche WebLink
502 Main Street(continued) <br /> • Tom Fudala advised that leeching pits for storm water are not allowed so they'll have to do <br /> something to get it fixed. Mr. Aucoin said "yes", they know. <br /> • Chief Baker noted it is important for Fire Department to look at chemicals used for <br /> refrigeration. Chief Baker also said that the Fire Department would probably want either an <br /> industrial hygienist or a life-safety review of the chemical storage. Also, how will they treat the <br /> ice? The size of the building needed. Further, what type of Zamboni will they use? <br /> • If it is.educational, Fire Department needs 2 or sometimes 3 accesses. Chief Baker explained <br /> that their architect will tell them where they fit on the code requirement chart and then we'll <br /> know what is needed. <br /> • Walter Yarosh commented that metal building engineers will not classify use. <br /> • It was also mentioned to Mr. Aucoin that metal building fasteners can be corroded and leak <br /> because of the ice-making process and cold temperature. <br /> The consensus of the Committee members was that it was a good idea and probably worth doing. <br /> Mr. Aucoin was again reminded that a building over 10,000 square feet goes to Cape Cod <br /> Commission. <br /> Approval of Minutes... <br /> Walter Yarosh motioned the Minutes of February 26, 2009 be approved as amended; Tom Fudala <br /> seconded the motion; and the motion was approved with George Baker and Glen Harrington <br /> abstaining. <br /> Charlie Maintanis motioned the Minutes of March 26, 2009 be approved as amended; Tom Fudala <br /> seconded the motion; and the motion was approved with Glen Harrington abstaining. <br /> Adiournment...Meeting adjourned at 10:40 a.m. <br /> an Giliberti <br /> ecording Secretary <br /> 2 <br />