My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-1988-ZONING BY-LAWS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BY-LAWS
>
1980-1989
>
1988
>
1985-1988-ZONING BY-LAWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:13:05 PM
Creation date
12/19/2016 10:00:09 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BY-LAWS
Meeting Document Type
Minutes
Meeting Date
12/31/1988
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> be prepared by the applicant , certified b`.f the <br /> Board of assessors . Insofar as possible , this <br /> hearing shall be held jointly (.-ii th -any other <br /> hearing required to be held for this project . <br /> ( d) The Planning Board shall within nines ( 90) <br /> days following the public hearing, certify in <br /> writing that the a.ppl i cation is approk.jed As <br /> submitted, .approved subject to modification , <br /> enied . If modified or denied, the Planning <br /> -.�,r'd _•hal 1 I r.•. l Ude k�Ir i +. ten reasons for the <br /> Action . If the Planning Board fails to issue <br /> its findings within ninety ( 90) days, the plan <br /> shal 1 be deemed Approved . Ho(k)ever• , no building <br /> permit shall be issued until the plan , signed <br /> by the appropriate number of members of the <br /> Planning Board shall be recorded in the <br /> Registry of Creeds and unt i 1 any appeal period <br /> has passed. <br /> (e) Approval of a special permit hereunder shall <br /> requi-re four-+ i f th s ( 4./'5) vote of the Planning <br /> Board. <br /> e-F) If the project is denied, the developer shall <br /> not submit substan t i a.l 1 y the same proposal for two <br /> (2) year,, except as provided under B. L . ch . 40 A , <br /> Section 11 . <br /> (g) Special permits granted Under this section <br /> =hall lapse within two ( 2) years, excluding time <br /> required to pursue or ay.jai t the deter-mi nat i on of <br /> an appeal , from the grant thereof , if a. <br /> substantial use has not sooner commenced or if, <br /> construction has not begun . The Planning Board <br /> may grant an extension for good cause , and shall <br /> grant an extension if the delay has been caused <br /> on account of the need to seek other permits. <br /> (h) No construction or reconstruction except as <br /> shown on the recorded plan shall occur without a <br /> further submission of plans to the Planning Board, <br /> and a notation to this effect shall appear upon <br /> the recorded plan and upon deeds to any proper- t-,-- <br /> within <br /> roper +'-,-within the Open Space Attached Bingle-Family <br /> Development . <br /> 9. 39 Building Permits - The developer shall submit to <br /> the Building Inspector prier to the issuance of a <br /> building permit with his .application for A building <br /> permit , a copy of the approoed subdivision plan <br /> together with evidence that the project phasing <br />�y schedule is being adhered to by the developer . Also <br /> proof that the Septic .and Well permit have been <br /> 9-11 <br /> iz i <br />
The URL can be used to link to this page
Your browser does not support the video tag.