My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/2017 BOARD OF SELECTMEN Minutes
>
3/6/2017 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2018 9:39:46 AM
Creation date
9/8/2017 1:41:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
03/06/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br /> Board of Selectmen <br /> Finance Committee/School Committee <br /> Minutes <br /> March 6, 2017 <br /> Discussion relative to the Quashnet School Door, Window and Roof Project: (continued) <br /> Additional questions regarding the project proposal were considered. It was disclosed the <br /> architect has represented all necessary 2018 code upgrades in the design and construction <br /> estimates. These changes are covered in the contingency. <br /> Regarding the assumption of hazardous waste materials Mr. Raymond indicated the roof and <br /> sealants are clean. There is no asbestos in the building, but there is a presence of certain <br /> adhesives which have been detected in the floor tiles near the windows. Remediation for <br /> hazardous clean-up is considered in the project contingency. <br /> When asked about the potential for mobile classrooms. Mr. Sivalogan stated if construction <br /> remains on schedule beginning in April he is confident the classrooms would be operational. <br /> Under the terms of the contract a penalty would be imposed assessing damages to the contractor <br /> if the project is not complete on time. To alleviate this concern it is the intention of the OPM to <br /> mark out with the School Principal, the core areas to be completed in a timely manner. <br /> The project is an open bid and it must go through the public bid process. Finance Committee <br /> member Ryan asked why the project architect and OPM are not from Cape Cod. The question <br /> was unanswered. It was noted that local contractors may be employed, but it is uncertain at this <br /> stage of the project. <br /> When asked of the materials; aluminum vs. vinyl proposed for the windows Mr. Sivalogan <br /> indicated aluminum windows are very durable, impact resistant and acceptable with the <br /> mandates of the MSBA. The EFIS soffit system has increased insulation and a warranty of up to <br /> 20 years. <br /> It was disclosed the School Building Committee works closely with the OPM and the design <br /> team, the School Superintendent, School Principal, Planning & Construction Committee, <br /> Assistant Town Manager and Director of Public Works. During the course of planning there has <br /> been different decisions and options made by the Town representatives regarding materials. <br /> With regards to school security Mr. Sivalogan indicated an officer of the MSBA is required to be <br /> on site during construction as well as a Clerk of the Works. Criminal investigation (CORI) is <br /> required for all manpower. In closing, it was noted the MSBA Accelerated Repair Projects are <br /> very popular and backlog is significant. The Town of Mashpee is fortunate the roof project has <br /> been included in the project scope. If the project was to be voted down by a vote of Town <br /> Meeting, the exposure to the Town is $172,000 which has been expended for the feasibility <br /> phase of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.