MASHPEE ZONING BOARD OF APPEALS
<br /> MEETING MINUTES
<br /> NOVEMBER 8, 20V
<br /> Mr. Gould made a motion to approve the project based on the following; a Plot Plan —
<br /> Proposed Deck Expansion, Prepared For Paul & Madeline Kruzel, 85 Popponesset Island
<br /> Road,Mashpee,MA. Prepared by: BSS Design Engineering&Surveying, Scale: V=20',
<br /> Date: Sept. 21, 2017, drawn by: EJP, MRT, Checked by: TB, Job number: 17151,
<br /> Revisions: Added mitigation planting Oct. 12, 2017, TJB, Added setback dimension to
<br /> NW deck corner, Oct. 19, 2017, Decreased deck size and planting area 10126/17. Drawing
<br /> Number: B25-79. Conditioned on all Town Department comments read into the record.
<br /> Mr. DeBarros, seconded. Mr. Gould, yes, and Ms. Sangeleer, yes, and Mr. Bonvie, yes.
<br /> All were in favor of the deck project.
<br /> NEW HEARINGS
<br /> 1.85 Wading Place Road: Petitioner, Steven Cook, Cotuit Bay Design requests a
<br /> modification to an existing Written Finding (FINDING-2012-32) for new house design
<br /> plans with new egress platform/steps on the east side of the house on property located in
<br /> an R-3 Zoning District, and Popponesset Overlay District, (Map 112 Parcel 90), Mashpee,
<br /> MA. (Owners of record: William and Doreen Wade).
<br /> Mr. Steve Cook, Cotuit Bay Design represented the applicants for this project. There was
<br /> a minor modification granted on May 1, 2013, and this property has a capped foundation
<br /> that has been sitting for a few years. The homeowners are ready to proceed with
<br /> construction and the plans that were previously permitted by the Board didn't work for the
<br /> homeowners, and there were a lot of code construction issues. A new set of plans were
<br /> designed and will work for the approved footprint, and there are two sides of egress. This
<br /> house will be a 2.5 story, two full floors and half story on the third floor. The half story is
<br /> two thirds of the area below per the zoning bylaw. It's a typical Cape style house with a
<br /> wrap-around deck on the first and second floors.
<br /> The top of the foundation is up about 15-16 inches, and when the floors are in, it will be an
<br /> 8.5 ft. wall height on both floors. The roof will be a 9-pitch, which is a total height of 29
<br /> ft.7 inches, so it's five inches below the 30 foot height restriction for the Popponesset
<br /> Overly District.The only change from the previous plan is the egress step was moved from
<br /> the south side to the east side. The code issues were taken care of, and the access to the
<br /> basement was corrected with the revised plan. The prior approval given was a Written
<br /> Finding, and this is just a modification with revised plans.
<br /> The Board asked if the original permit time had lapsed. Mike Mendoza, Building
<br /> Commissioner's non-legal professional opinion is that because there is an existing
<br /> foundation the applicant acted on the Written Finding. The question for the Board would
<br /> be;was the original Written Finding issued for the site, and is the height of the building the
<br /> same or was it increased? Originally,'this application was for a two-story building, and
<br /> now it will be taller. An argument can be made whether or not if all the surrounding houses
<br /> are within the character of the neighborhood. This could be viewed as detrimental to the
<br /> neighborhood because of a change in character to the neighborhood.
<br /> 2
<br />
|