My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/26/2017 CONSERVATION COMMISSION Minutes
>
10/26/2017 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2018 11:00:18 AM
Creation date
1/3/2018 11:00:12 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resource Area: Land Under Ocean, LSCSF, Shoestring Bay <br /> Peter Merlino, Trustee, explained the Trust was applying for an Amended Order of <br /> Conditions for a proposed dock extension. They are proposing to rotate the float 90 <br /> degrees, put in a new float (encapsulated) and change the ramp to an aluminum ramp <br /> and some alteration of the existing pilings. The Agent stated the Harbormaster and <br /> Shellfish Constable have no issue. There is no land containing shellfish and no issue <br /> with the reorientation of the float from a navigational standpoint. <br /> No comment from the public <br /> Motion: Mr. Sweet moved to approve the Amended Order of Conditions, <br /> seconded by Mr. Smith. Vote unanimous 6-0 <br /> 6:18 John J. Pike and Alice J. Pike Smith, 39 Wilsons Grove. Proposed septic <br /> system upgrade. RDA <br /> Resource Area: LSCSF, Buffer Zone to Coastal Bank, Vineyard Sound <br /> Tom Bunker, BSS Design, represented the applicants. He stated the existing septic <br /> system has failed and the applicant is seeking approval to upgrade the system. He <br /> referred to the plan provided. The system is proposed to be in the same location. The <br /> existing cesspool will be pumped and removed from the property. The proposed system <br /> will meet Title V. regulations. They are requesting a variance from the Board of Health <br /> because the town regulations require 100' from a water body and the proposed distance <br /> is 86 feet. They are scheduled to meet with Board of Health next week. All areas <br /> disturbed as a result of the work will be graded and restored to their preconstruction <br /> conditions. <br /> No comment from the public <br /> Motion: Mr. Sweet moved for a Negative Determination, seconded by Mr. Smith. <br /> Vote unanimous 6-0 <br /> 6:21 Jeffrey L. Shames, 19 Bowsprit Point. Proposed reconstruction. of bulkhead <br /> seawall and ramp/float structure within same footprints. NOI <br /> Resource Area: Coastal Bank, BVW, salt marsh, LSCSF, Land Under Ocean <br /> Jeff Ryder, BSS Design, represented the applicant. He explained the proposed project <br /> is to reconstruct an existing wood ramp and float and to improve landscaping which <br /> includes retaining wall reconstruction into the Waters of Popponesset Creek. The <br /> proposed project is the reconstruction of the 32 foot licensed float and the 44 foot timber <br /> retaining wall. The seawall reconstruction will involve total removal of the old wood <br /> structure and rebuilding the wood dock in the same footprint. The old posts will be <br /> upgraded from 10" posts to 12" wood pilings. The size of the dock will remain at 6' by <br /> 32' and will match the existing deck. The entire pier decking will be changed to new <br /> composite dock grating. The retaining wall reconstruction will be mostly by small <br /> 4 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.