Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MEETING MINUTES <br />JULY 26, 2017 <br />Mr. Bonvie read the Board of Health and the Inspection Department comments into the <br />record. He said as one member he would like a plan that is correct, and depicts the kitchen <br />and the compliance of the apartment under the bylaw and needs to be reflected in the formal <br />document. He suggested an engineer provide the correct dimensions. <br />Chairman Blaisdell would like the applicant to comply with the bylaws and provide the <br />Board with a revised plan depicting the square footage of the total structure, the square <br />footage of the apartment, and the correct dimensions of the parking. <br />The Board reviewed and determined that the accessor's records may be incorrect and would <br />need to be reconfirmed by the Assessing Department. <br />Building Commissioner, Mike Mendoza commented to the Board that the Assessors' <br />record might be incorrect and that the accessory apartment was built back in September of <br />2014 without any permits. He asked the applicant what he believed the dimension of the <br />house was. <br />Mr. Hall said 1,660 square feet. He requested a continuance until the next hearing on <br />Wednesday, August 9, 2017. <br />There were no more comments from the Board or audience. <br />Mr. Bonvie made a motion to accept the applicant's request for a continuance. Mr. Gould - <br />second. All were in favor to continue the hearing until August 9, 2017. <br />34 Riverside Road: Owners, David E. and Martha L. Thompson request a Written Finding <br />under § 174-17 of the Zoning Bylaws to allow for construction of a bedroom addition on <br />property located in an R-3 Zoning District, (Map 119 Parcel 125), Mashpee, MA. <br />Mr. Bonvie stepped down from this hearing. Mr. Gould sat in on this hearing. <br />Mr. Steve Cook, with Cotuit Bay Design represented the application that is currently a 788 <br />sq. ft. cottage built in 1932 which is pre-existing, non -conforming. The proposal is a new <br />bedroom addition as shown on the site plan highlighted in lavender. The existing house is <br />6.8 ft. on the right property line, 9.5 ft. to the bulk head, and 17 ft. from the street. The new <br />addition is conforming to zoning regulations showing 16 ft. from the rear, 33. 2 ft. from <br />the left property line, and 40 ft. from the street. The existing lot coverage is 14.6%, and <br />will increase to 17.6% and is still under the 20% requirement. The new addition will be in <br />closer space with the porch but all exterior features match the existing cottage. There's a <br />new three bedroom septic system proposed for this property. The existing garage and old <br />foundation from a green -house will be removed from the property. <br />Mr. Goldstein read the Board of Health, Conservation and Inspection Department <br />comments into the record. The question from Board of Health was; "are there calculations <br />to show that the primary SAS is designed for three bedrooms"? <br />2 <br />