My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/5/2015 CAPITAL IMPROVEMENT PROGRAM Minutes
>
2/5/2015 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:50:12 AM
Creation date
1/10/2018 9:55:15 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
02/05/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program Committee <br />Minutes <br />February 5, 2015 <br />DEPARTMENT OF PUBLIC WORKS: (continued) <br />Also proposed for replacement is the 2006 Chevrolet 3500 1 -Ton dump truck. It <br />is one of four dump trucks used on a daily basis by the DPW. Repairs have <br />become recurring, and costly. The bed of the truck is significantly rusted and in <br />need of replacement. The cost to replace this vehicle is $76,300. <br />Ms. Laurent indicated that all larger truck bodies are proposed for replacement <br />with more durable stainless steel beds. <br />In fiscal year 2016 the DPW has proposed to replace the 763 Bobcat with a Terex <br />Track Loader with a V -plow, or similar equipment. The Track Loader would be <br />utilized to clear the sidewalks and bikepaths more efficiently. With a standard <br />attachment, the Track Loader would be used throughout the year for other uses. <br />It was noted the Town has over 6 miles of paths and sidewalks with more <br />projected. Currently the walkways and bikepaths are cleared with a self-propelled <br />walk behind snow blower or with a Bobcat bucket too wide for sidewalks. The <br />cost for the equipment is $35,000. <br />PLANNING & CONSTRUCTION: <br />Flooring Replacement - $50,000 <br />Replacement of Flooring in Various Buildings - $50,000 <br />Continued annual funding is requested to replace the flooring, carpet or VCT at <br />various Town buildings. The project proposes to replace flooring installed in <br />1996 at the Middle/High School. To date, approximately 1/3rd of the classroom <br />flooring has been replaced. The cost is $50,000 to complete 4 to 5 classrooms. <br />It was noted that last year rental fluids contributed to the flooring replacement <br />project. With declined rental funding, the budget has decreased significantly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.