My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/02/1999 CAPITAL IMPROVEMENT PROGRAM Minutes
>
11/02/1999 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:03:33 PM
Creation date
1/19/2018 10:38:16 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
11/02/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Committee <br /> Minutes <br /> November 2, 1999 <br /> CI Submissions Review: <br /> .Leisure Services D <br /> The Committee discussed the Capital Improvement needs of the Leisure <br /> Services Depamnent with Gus Frederick,the Leisure Services Director. <br /> ,after a detailed discussion, the Committee agreed to accept the <br /> Recreation Building Needs Study in fiscal year 2001 for a preliminary cost <br /> estimate of$25,000. The study will determine a needs assessment for <br /> the expansion or new construction of a recreation building. <br /> The possibility of incorporating the study with needs of the Council on <br /> Aging, Hwnan Services and Social Services was considered. A joint <br /> expansion study may combine the entities or determine individual site <br /> locations. The use of the newly constructed Water District building was <br /> suggested as future housing for Hunan Services. <br /> In n effort to maintain the present configuration of the recreation <br /> building,the use of Town Building and Maintenance Account funds will <br /> be considered for general on-site repairs. The estimated cost is $14,000. <br /> Wherefore,the expansion of the recreation building as proposed in fiscal <br /> year 2001 with a preliminary estimate of$401,960 was deferred. <br /> Project leo. 3,the South Cape Beach multiple use building was considered <br /> in fiscal year 2002 in the capital improvement proms. Town income <br /> from beach concession will be reviewed. We multi-purpose building as <br /> proposed would provide Mate mi mum requirements for lavatories, and <br /> accommodates suitable space for lifeguards and beach attendants. In <br /> addition to providing a sheltered area for injured bathers. <br /> The Sampsons Mill Road field development for expanding youth sports <br /> programs was placed on Bold for additional review. The Director of <br /> Public Works will be consulted with respect to preliminary cost estimates <br /> that are also contained in the DPW budget submission. Ballfield lighting <br /> to complete phase H of providing outdoor athletic lighting to the ballfields <br /> at Heritage Park is proposed in fiscal year 2003 as is a four-wheel drive <br /> light duty pick up truck for the Leisure Services Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.