Laserfiche WebLink
Conservation Commission <br /> February 1 , 1992 <br /> Page 3. <br /> Mr. Gardner agreed with all the suggested conditions. <br /> Abutter receipts were presented, <br /> If the well option is chosen, Mr, Gardner will come back in for the Commission's <br /> recommendations for erosion control. <br /> *30 RFS HMLER for the reconstruction of a stone revetment damaged by the <br /> hurricane at 156 Popponesset Island load, Dave Sanicki presenting. Mr. Hendler <br /> received an emergency order to reconstruct damaged rip-rasp. As a follow u , this <br /> Is the After-The-Fact Notice of Intent, work is complete and this is pi7ocedural. <br /> MEPA reply date -i's today; he is unaware of any comments. <br /> Mr.' Sherman advised Pain. Somerville and Dave Ryan stated there is alteration <br /> outside the scope clone by the contractor which did alter shellfish habitat. He <br /> read into the recons Mr. Somerville's comments. <br /> Mi <br />