My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/26/1992 CONSERVATION COMMISSION Minutes
>
3/26/1992 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 5:06:31 PM
Creation date
1/26/2018 11:26:04 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/26/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Conservation Commission <br /> March 2 , 1992 <br /> 'age 6. <br /> Mrs. Sons asked if there would be replacement of trees and was told no. <br /> Mr. Borselli stated where there is vegetation it is heavy. <br /> Mr. Sherman stated it may be necessary to run this by the Commission's arborist <br /> without charging a fee, He is concerned about the blank spots. <br /> The numbers of plants were specified. <br /> Mrs. Sons asked that the arborist suggest what type of gree replacement that <br /> shotdd be done. <br /> Mr. Sherman stated some of the trees that mere cut were oaks that will sucker out <br /> again. It becomes a case ' trying to get a mix of plants to provide wildlife <br /> habitat and replant the bank, <br /> Mrs. Simmons stated the Commission may want two or three trees put in the buffer <br /> zone. She asked if the bank would benefit with a platform to direct traffic <br /> Nor. Borselli stated that could be done and asked the appropriate dimensions; <br /> 1 x ' was suggested and could be conditioned. He stated he would like to <br /> reprise the plan anyway. A 4 x 6 could be used if it works out better, <br /> The Board of Appeals has granted a special. permit, <br /> Mr. Besrosiers pointed out there is no mention in the narrative that the shed <br /> will be removed. Mr. Borselli stated it is on the plan. The Commission will <br /> need receipts for it's disposal, as well as the stairway. <br /> Mr. Borselli advised he met with the shellfish warden who recommended that as <br /> long as 15 feet out from the edge of the salt marsh, there would be no adverse <br /> affect, <br /> Questi&n was raised whether the order of Conditions is issued on one or both <br /> properties. It will be conditioned that it be recorded on both deeds. <br /> =: Motion made and seconded to close upon receipt of revised plans and <br /> after the agent has spoken with the amorist to review the planting plan. <br /> Mr. Desrosiers stated the plan calls for rem gyral of trees. Mr. Borselli stated <br /> it is specified that they be flush cut. <br /> They will meet with-the Agent onsite. . The Commission should reserve the right <br /> that if Ellis Aden views the plan and feels it requires mother onsite, the <br /> applicant should pay for this. Erosion control fabric may be conditioned, a <br /> well as the plantings* There are 12 gees. <br /> Mr. Sherman stated deae trees are very important for wildlife habitat, <br /> TO BE CLDM U RPT. <br /> � ] to license an existing3 pier, ' x 14' ramp and <br /> t x 1 float, moved 20 feet east, and proposed elevated stai rcase 'to existing <br /> deck, pipe piles to be replaced with ' wooden pilings at 112 Captain's Roar. <br /> Mario DiGregorio and Roger McNevish presenting. The current situation is not good. <br /> The only changes are shifting the entire structure to the east. They are replacing <br /> some galvanized pipes holding the Moat with timber pilings. They are also changing <br /> it to 6 x 16 ft. , 96 square feet. This will get the, boat 'off the bottom at low tide, <br />
The URL can be used to link to this page
Your browser does not support the video tag.