My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/26/1992 CONSERVATION COMMISSION Minutes
>
3/26/1992 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 5:06:31 PM
Creation date
1/26/2018 11:26:04 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/26/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> March 26, 1992 <br /> Page 7. <br /> This will gain an additional 1 1-1/2 feet of water. They are also elevating the <br /> pier t the full. feet; stairs will lead from the deck open risers,, It i <br /> coastal bad with" at the toe which .'s in bad condition. This is for <br /> repair and maintenance as well as shifting of the structure. Ther are propoglM <br /> Awn <br /> seasonal ramp. The beach association is an abutter and the structure must be <br /> 25 feet away, unless with their approval. <br /> Mrs. Simmons asked for a recei t of o. This was agreed. <br /> Mr. DiGregorigalated there 'll be a acin n d the oat <br /> =terial will be encapsulated. <br /> Mr. p would want a guarantee that it will be hand ding and the stairs will <br /> 5eowwomn <br /> o � <br /> Mr. McNevish offered to put a detail on the plan re the stairs. <br /> Mr. Sherman stated spacing can be conditioned. The Mashpee River is within the <br /> s-timate i Habitat Zone. It was noted a packet has been sent to Natural Heritage <br /> and the receipt provided; 30 days has passed. <br /> Mr. Desrosiers asked if there will be any changes to the ri]2raR and was told none. <br /> Mr. Sherman will contact Paul. Somerville for cements. <br /> o'er: Motion mada..aiad Zeconde to close after the ref' t <br /> 7 comments from the shellfish warden, <br /> Spacing and removal of debris to be conditioned. <br /> f <br /> 1 T <br /> TO BE. CIDSIMUPON RECEIEPT OF COMMENTS. <br /> i <br /> 9:15.._ T_�T. _ ..W. t license an existing pier, ramp and floats and out1.n <br /> re Da trance at 41 Fiddler Crab Lane. bio Di Gregorio presenting with <br /> oger cNevis ev�.sed plans were reviewed. Vere is an existing 32 foot pier with <br /> 9-1/2' ramp and 2 floats anchored with pipe pilins with arms that extend t balance <br /> g e <br /> and anchor the two floats. Other or re airs, they are ping to Further stabilize <br /> the a t s. The s.f. a i t i on i s or a re s en c s ted <br /> b cone tin s. They are going for Ater 91 a ee not want to <br /> elevate this because e would have to replace pilings. <br /> It is preferred to leave it as it is with minor maintenance. There is no tie-back <br /> beneath the pier 2-3 ft. over the salt marsh. There Is the sunlight enetration with eI - <br /> tion. <br /> Mr S. `sons stated if anything is to be done, it will be neeessa tont in better` <br /> s a <br /> Mr. Sherman stated input from the shellfish warden has not been received; the hearing <br /> cannot be closed tonight, <br /> Mrs. Simmons would like to see more details on the deck enlargement. <br /> Mr. McNevish stated it is a 9 foot extension; one post In the comer will tie in, <br /> Mr. Sherman stated the existing deck is over the coastal bark. They are not removing <br /> g <br /> what has been there but to add to it is considerable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.