Laserfiche WebLink
Conservation Commission <br /> wJuJ_y 11, 1991 <br /> Page 4. <br /> 8:30 ANTMNY F, HEOLEY for the demolition of an existing dwelling; construction <br /> of dwelling, garage, deck and sewage disposal system; and relocation of an existing <br /> sexed, at 63 Hoophole Road. Bob Raymond presenting. The dwelling will be further <br /> from the pond than before. It-will be a gravity system more than 200 feet off the <br /> top of the bank. The new driveway is to be of crushed stone. The old dwelling <br /> will not be demolished until the new dwelling is constructed and will act as a <br /> buffer. <br /> Mr. Sherman saw no problem with the project but asked if sizeable trees Will be <br /> lost? Mfr. Raymond advised in areas of the sewage disposal there would be, but <br /> not many in the area of the house. The driveway is existing and services adjoining <br /> property, also a family member. There will be town water hookup. The pump house <br /> wi <br />