Laserfiche WebLink
' Conservation Connission <br /> August 2 , 1990 <br /> Page 6. <br /> 8:15 ED DALY, for the construction of a single family dwelling, wooden deck, <br /> subsurface sewage disposal system, water service and driveway at Lot 1+ <br /> Horseshoe Bend Way. Dave Sanicki presented abutter receipts. An environmental <br /> study was provided to the Commission. The bog area towards the pond is overgrown, <br /> A pervious driveway 'is proposed. Town water is available. This lot is along the <br /> old borrow bank for the bog. <br /> Mr. Coffey questioned the percentage of upland which Mr. Sanicki agreed to provide. <br /> He stated other towns have percentage requirements for buildability. He asked hoer <br /> long since the bog was warned and was told it was 5 or 6 years, fir. Sanicki stated <br /> the ACOS advised it has to have been harvested two out of the last three years not <br /> to be considered abandoned. Decisi <br />