Laserfiche WebLink
;Conservation Commission <br /> November 1, 1990 <br /> Page 7. <br /> �P <br /> Mr. <br /> Ze enfeld advised one can stall see the remains of what was put down at sandy <br /> Beach. At Tide Watch, their revetment is being repaired. <br /> Mr. Grotzke advised, because of financial constraints, Tide Thatch has been reluctant <br /> to do beach nourishment which they are not required to do. New Seabury has done it <br /> for them. <br /> Mr. Sherman agreed the beach nourishment t should be done. <br /> Mr, Zeppenfeld advised DEP feels it sherd be done also. <br /> Coffey asked if the prior order of Conditions would be appropriate and <br /> Mr. Zeppenfeld offered to- draft some conditions. <br /> It was suggested that when sampling will take place be noted. <br /> To be reviewed with Jiro O'Connell on November 8th, <br /> There were no comments from the public. <br /> Motion made and seconded <br /> Motion o continue to November 1. , 1990 -- ; . The Order <br /> of Conditions to be written at that time if information is satisfactory. <br /> CONINUID TO NOVEMBER 15, 1990 - 6:58 <br /> 9:00 NEW SEABURY CO. for an amended order of conditions for Lot 1372 Shore Drive, <br /> Se 43-878. Mr. Zeppenfeld advised approval has been received from Board of Health. <br /> They are awaiting DBP comments. The landscaping plan is changed and they have put <br /> in breakout walls which must be approved by BEP. It is -9 feet to the bottom of <br /> the wall; elevation 14.8. <br /> Mr. Sherman advised the regulations state it is assumed under Title V that performance <br /> standards are met. <br /> r. e nfeld pointed out the ha bale line runs at the top of the bank. There is <br /> pe <br /> no concern with runoff. This i spelled out in the original order of Conditions. <br /> TheP lan is amended to include two breakout walls, the sane height as the leach <br /> Pit. <br /> =: Motion rade and seconded to close the hearing for Lot 1372. <br /> '.A .� CLOSED <br /> 9:15 NEW SEABURY CO. for an amended order of conditions for Lot 1373 shore Drive, <br /> SE 43-882. The- same information applied to this order. <br /> Vim: Motion made and seconded to close the hearing for Lot 1373 based on the <br /> information presented. <br /> Phyllis Paskauskas asked the life expectance of the breakout walls. Mr. Desro iers <br /> advised it would be the same as a basic foundation, if properly constructed. <br /> Mr. Zeppenfeld advised it would be longer as it does not have any Loading on it. <br /> 9:30 BRADFORD WUATM for ars amended order of conditions under BEP SF -764 at <br /> Lot 11 Tide Run. <br /> C NTDHM TO W0VEMBER29, 1990 - 7:45 AT TO REQI= OF THE APPLICANT* <br />