Laserfiche WebLink
Conservation Commission <br /> April 5, 1990 <br /> Page 3. <br /> When asked how long the ha,yb l s should remain, Mrs. Simmons stated until the <br /> slope is established. FIs LeBlanc asked, if the seeding of the slope is well <br /> . established, could a Certificate of Compliance be considered this summer. <br /> Mr. Sherman stated he was pleased the driveway was going to be addressed <br /> tonight and was disappointed is has been withdrawn. Ms LeBlanc was unsure <br /> f what is happening. Nor. Sherman suggested the Commission write t <br /> Mr. Talanin# <br /> Ms LeBlanc suggested, if Mr. Talanian is going to proceed, it could be part of <br /> this filing, not an additional filing, Mrs, Simmons agreed. <br /> TO BE CLOSED UPON RECEIPT OF CORRESPONDENCE RE THE SILTATION SCREEN AND PLANTING. <br /> A LETTER TO BE WRITTEN TO MR, TALAI IAN. <br /> 8:30 CHARLES J. VIOLAS, to remove a portion of an existing floating strutur , <br /> reconstruct and modify an existing pier and maintain an existing stairway at <br /> 1 Frogs Pond Close. Todd Palmatier advised there are two parts of the project <br /> tonight,, the existing stairway down the coastal bank and reconstruction of an <br /> existing pier ramp and floats, Th have received Board of Appeals approval. <br /> The walkway is elevated on sono tubes with one major deck and small landings <br /> ig-zagged to protect some trees on the bank. He suggested Bearrry b <br /> planted, it would spread. Plantings are described in the Notice of Intent. <br /> Mrs. Simmons stated extras vegetation is necessary because of the erosion. <br /> Everything will have to be opened up, there is no spacing. <br /> Mr. Sherman pointed out there are two gutters going down the bank. Charles <br /> V Blas, Jr. stated they plan to eliminate them and put in a dry ell. <br /> Todd Palmatier felt it may be difficult to reroute the drainage but agreed <br /> it could be put as. close to the wall as is possible. <br /> 1 <br /> Mr, Sherman asked that the faucet half way down be raved to the far end <br /> Nor. Viglas agreed to moire it to the lower landing. <br /> Concerning the existing dock, ramp and floats, . Pal mat i er advised the first <br /> float i s actually sitting on the bottom in law water.' It is planned extend <br /> the supported pier out beyond Mean Low Water. All the floats will be brought <br /> i n, five instead of six will be bolted together. They are reducing the length <br /> of the structure by 80 feet. By raising up the pier, they will be allowing <br /> sunlight to reach the marsh. Posts will be 6 X 6's. <br /> Paul S rville's comments were read. <br /> . Sherman expressed concern with the floats stored on the marsh in the winter. <br /> . York stated the floats should be removed immediately, The junior r. V i g l ass <br /> advised they will be removed by the next Sunday and in the future they will be <br /> left in orstored on top of the platform. <br /> Concerning revegetat i n of the bare spot,, Mr, Pa lrat i er suggested Bearberry. <br /> . De s r s i ers stated they should also declare there are five floats, not six. <br /> TO BE CLOSED UPON RECEIPT OF MODIFIED PLAN SHOWING THE DRY ELL AND PLANTING <br /> DESCRIPTION AND NARRATIVE OF AGREED CPDD ITEMS. <br />