Laserfiche WebLink
4 <br /> Conservation Commission <br /> May 31 , 1990 <br /> Page 6. <br /> Mrs. Simmons asked if the steps will remain. lir. Palmatier stated to take them out <br /> might destabilize everything. She suggested a platform approach to get any impact <br /> off the lip the bank. <br /> To BE CLOSED AT,THE NEXT HEARING AFTER THE RECEIPT OF A REMISED PLAN WITH PLATFORM. <br /> NEW SEABURY CORP. , Hearing was scheduled to be held at 7:00 p.m. Brian le penfe l d <br /> was detained at a meeting with the Board of Health, The hearing began at this <br /> later available time. <br /> Brian Ze' ppenfeld and Al Abrahamson presenting, The project t was reviewed. <br /> Lot 1366; Drawing revised and calculations unchanged. i <br /> Lot 1366; System roved and places revised to eliminated breakout wall . <br /> Note: There will now be only one breakout wall on the whole project. Board of <br /> Health approval has been received for everything on the plans. � <br /> Lot 1367: o c-hange. <br /> i <br /> Lot 1368, Has a shallow system, moved into a grassy area, no vegetation. It is <br /> out of the trees. Pump eliminated. <br /> Lot 1369. Septic leaching pit has been moved back further from the pond side. <br /> Lot 1370: Pit has been relocated. <br /> Lot 1371 : No change. <br /> Lot 1372: Pit moved back. <br /> Lot 1373: No change. <br /> Lot 1374; Eliminated the wall . <br /> Lot 1375: No change. <br /> Lot 1376: No change. <br /> Lots 1377 & 1378: No change,, more comprehensive plan provided. <br /> Mr. Coffey asked how much deeper they would be going and was told It wouldnot be <br /> one foot. <br /> The cutting of three pine trees will be required which they will replace with several <br /> more trees. 1378 has Rosa Rugosa and daponese Honeysuckle to be removed and replaced. <br /> Sic Wheel dumps will be coming in between the last three cottages. They will remove <br /> the brush and three trees and then bring in material . They will be excavating 4 to <br /> 6 feet. Septic pit and leach fields will be put in place before materials are <br /> brought in, <br /> Mrs. Simmons stated the wall is going to go right through the dune. <br /> . Zeppenfeld stated it will be below grade when finished. They will excavate <br /> between 1 - 2 feet. They will be covering, over the fill . <br /> Mrs. Simmons asked if they could swing the system to the side and was told no, it <br /> would be closer the bank. <br />