Laserfiche WebLink
Conservation commission <br /> Meeting of June 14, 1990 <br /> Page 2. <br /> Mr, Sherman stated he has no doubts cora i nerrta l will maintain thE, area without <br /> furth .r disruptive effects. He also felt the question is precedent. <br /> Mr. Coffey stated th {re is such a lour probability of impact there is a qUE-stion <br /> f threshold, If it did ccrre in as an. RDA, it would be a n gati ve because it <br /> meets such a tow threshold of possible impact. <br /> The commission was polled and were in agreement with Mr. Coffey. <br /> DOTED: In the future the agent is td be contacted well in advance of any <br /> project for any erosion control M -a sures required, <br /> 7:30 SIDNEY COVICH for a determination of applicability on a request to <br /> install the permitted portion of an existing pier on an interim basis pending <br /> approval of construction for a new pier under State and Federal permitting <br /> processes at 141 Daniel 's Island Road. Todd Palmatier presenting with Torr <br /> L nergan. Abutter receipts were presented. Due to the length of time for <br /> permitting, ACRE received and awaiting chapter 91 , they are requesting to <br /> Put in part of the e istina pier ramp and floats. Three finger floats will <br /> not be put in and three pipe piles to secure them will be removed. ' They <br /> propose to reset the 4 - 4 inch posts and re-establish the ramp and two <br /> floats for this boating season. This is what was originally permitted under <br /> an Order of Conditions that has expired, They are looking for one season only, <br /> Paul Somerville stated he Inas no problem with the project. No silt screen' is <br /> necessary as long as any shellfish floated free are replanted. He offered to <br /> be present during construction. <br /> Ms Behrman asked Mr. P lmati r if he would be amenable to Mr. Somerville 1 s <br /> suggestion. Mr. Lonergan who will be supervising the work agreed and will <br /> advise Mr. Somerville when work is beginning. <br /> IST : Motion made and seconded for a negative finding ng ass long as the Shellfish <br /> Warden will be notified and 'will be present. <br /> 7:45 ILL IAM J. DE Y, to relocate an existing 501 'r- dock in Poppones set Bay <br /> at 122 Captain 's Row. Greg Taylor of Taylor Design Assoc, presented abutter <br /> receipts. Mr. Deery was present also. The dock was constructed 20 years ago. <br /> DD ft. radius has been maintained. The end of the istin dock was not <br /> on his property and he is requesting to more it over to a nary--vegetated area. <br /> No problems were raised by any abutters. <br /> Ms Behrman asked how this will be moved and was told it is seasonal but the <br /> ' x 41 pressure treated wood posts remain. They will be installed by hand, <br /> driven. The float i s secured by 5 - 2" pipes, seasonal for the 2 - <br /> floats tied together. The float is stored off the wetland areas for the <br /> winter. The existing pipes will be removed. <br /> Mr. Coffey abed if a 'IT" configuration would serge as well? It was noted <br /> there are no soundings on the plan. <br /> Mr, Taylor stated high water in the area is approximately S feet. <br /> Mr, Somerville advised there are no she l l f i sh resources in the area and no <br /> eel grass. It is non-productive and he sees no harmful effects from the <br /> structure. <br /> Mr. Taylor advised they are seeking routine maintenance. Mr. Sherman stated <br /> boards can always be replaced without a notice of intent but when piles are <br />