Laserfiche WebLink
Mashp e Conservation Commission <br /> Meeting of larch 20, 1986 <br /> Page Seven <br /> Ir. Rosenberg also noted that DEQE has pointed out that the <br /> proposed septic system does not conform to Title V. <br /> The Chairman stated that the hearing will be continued on March 2 <br /> immediately following the hearing for Lot #9 Ockway Bay Road. <br /> w�l - - I 1+1�-I i/irilyiitF�iiY�� <br /> Stone Construction Company. and mcGrath, Inc, -- Agent <br /> This applica-tion is to c onstru t and maintain a single-family <br /> dwelling with attached garage , deck, driveway, on-site sewage <br /> disposal system and appurtenances ; to grade , loam, seed and plant <br /> t Lot #17 ockway Bay Road, Assessors' Map Nos • 99 and loo . <br /> Mr . Robert Bergman presented plans and stated that. staked hay <br /> bales will be placed on the dwonslope side leaching the bog area <br /> on that side . Re-grading in the immediate edia.te vicinity of the house , <br /> Water source is Highwood Water Company and the water rain is on <br /> ckway Bay Road . The driveway will be level after --grading at <br /> the 30 ' contour . This will entail taking out the whole bank. <br /> This will not adversely affect drainage . There is an "ancient <br /> way" in the area. Mr. Bergman will check with the Planning Board <br /> as to restrictions . <br /> I <br /> The Chairman called for further comments , discussion or questions . <br /> There were none and so the hearing was closed and the proposal <br /> will be taken under advisement . <br /> New Seabury Cor oration (BSC Cape Cod Survey Consultants t Inc <br /> Agent <br /> I <br /> This application is to re-ccnstruct with compatible materials , <br /> revegeta. e and maintain an eroded coastal dune/bank resource <br /> area extending appr o ima.t e ly o - - f e along the Nantucket <br /> Sound shore-lire at the New Sea.bury Golf Course , lap No . 0131 , <br /> I <br /> Plots 0002 and 0003, <br /> Mr.. d Donnelly, representative of the Agent , presented plans . <br /> He stated that the area has a very thin vegetative cover and there <br /> is concern for blow-off. The project is considered necessary to <br /> prevent storm damage . Material brought in will be compatible . <br /> The dune will be revegetaed with beach grass , rugosa nose , pitch <br /> pine and beach plum. It 'is proposed to put in a new service road <br />