Laserfiche WebLink
f <br /> Mashpee Conservation Commission <br /> Meeting of May 1, 1986 <br /> Page Three <br /> access will have to be down over the coastal bank.' The Commi- <br /> ssion should have a topo profile , <br /> Motion was rade by Ms . Behrman "that this hearing be continued <br /> until the Commission receives proposed methods of access to the <br /> dock and elevation profiles in the area, of the access to the dock. <br /> Mrs .. I eLory added , "further,, to continue until after the Appeal <br /> Board hearing" . - Mr. Rosenberg seconded the motion which was unani- <br /> mously carried. <br /> Hearing will be continued to May 22 , 1986. <br /> Robert L. and Barbara Buona o (Arrow Engineering Inc * Agent) <br /> This proposal is to construct and maintain a mooring facility <br /> consisting of a fixed pier, ramps and six .' x ' floats at Lot #44 <br /> Popponesset Island Road. <br /> Robert Raymond presented plans . He. stated that this is a modified <br /> plan presented to reflect dynamically changed conditions at the <br /> site . The original filing i was reviewed c it appears that there <br /> has been a considerable amount of landscaping done pr3-or p3-orto this <br /> current application. The on-site i <br />