My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/26/1986 CONSERVATION COMMISSION Minutes
>
6/26/1986 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 5:02:45 PM
Creation date
2/6/2018 2:55:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/26/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee conservation Commission <br /> Meeting of June 26, 1986 <br /> Page 2. <br /> Meadow Haven Realty Trust - Continued: comments from the commission were that <br /> a large upland area was cleared, the lot marked , but no stades for the house. <br /> visualization of the extent of clearing that will be necessary is required <br /> due to the ' work limit from the river. <br /> Mr. Richardson Jonas asked to speak and stated he was not-,notifled b y mail <br /> He expressed concern as to how close they are to the road which be identified <br /> as n ancient way. <br /> The caiman advised Mr. Jonas Town counsel has declared it is not ars ancient <br /> way and also , that he is in violation of the Wetland Protection Act for clearing <br /> within loo ' of tete river bank. <br /> VUTE: Moved and seconded to continue to net week, July 3, 1986. <br /> M1 + <br /> E wara F. Lundgren (wilson Hi E l Associates , Agent) - 41 Magnolia Lane. To <br /> construct a single family dwelling within 100" of freshviater wetland, <br /> No one appeared to present data for this petition, It was n tea no check <br /> was received. <br /> lett er was written that no clearing o work is to take place at the i te� <br /> without a public hearing and Order of Condi it , including a . AI.E. file <br /> number. Ad cut trees ana slash are to be removed immediately from the area <br /> by hand and no heavy eau i rent is to be used on the site. The area for the <br /> mouse should be staked prior to any hearing. <br /> Mashpee Shores Realty Trust Arrow Engineering , Inc. -Agent) Redwood Circle. <br /> Jack Sullivan , Trustee, presenting . To create a community recreational beach <br /> area for the residents of Mashpee Shores. To out and grade the site, deposit <br /> and grade sand in the beach area, construction of retaining walls . <br /> Mr. Sullivan stated this is a registered piece of land marked Reserved Area A, <br /> a beach area and the intent is to finish by excavating o t going down to the <br /> beach. Trees will be removed. He referred to a similar project several years <br /> ago , Reserved Area C, at the opposite end of the development. <br /> Commission concern was expressed for the herring spawning areas . and the creation <br /> of a funnel effect. The area falls within the 100' setback ruling of the Mashpee <br /> River. A variance would be required from the Board of Appeals . <br /> In answer to commission suggestion that a walkway be built, Mr. Sullivan stated <br /> this would be unacceptable. <br /> Ernest Roberts , Mashpee Shores , addressed the Commission and stated the trees <br /> of which Mr. Sullivan spoke have already been removed. He further stated Mr. <br /> Sullivan has a stop order~ abutting Mashpee River. He recommended construction <br /> of a path , without all the excavation. <br /> Mrs . Charles 1cIntosh, abutter, stated she objected to the proposed use of <br /> gravel in a steep walkway and suggested a graduated step walkway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.