Laserfiche WebLink
R-a} aiXa 4 <br /> Conservation C omni i s s i n :�. : <br /> Meeting of September 4, 1986 <br /> Page • ,_f 17rr.h <br /> • • <br /> oh Realty Trust - Continued: From rea r of the rets i n r ng w 1 I tow - :". �. <br /> pond will be undisturbed and there will be a 35 foot wide buffer. Thegra'dinq <br /> in front allows for a swaled area and drainage t be percolated hack i nt � the° r <br /> ground. echa r i ng roof drains, revegeta t i ori and mulching of disturbed areas-..Y��.are proposed. The retaining wall is 10 feet from the edge f the deck and,. the: <br /> decd is 10 feet deep. It is expected <br /> ected t fill behind the retaining w l : nd; o ,f <br /> i ia�ti + <br /> -500 cubic yards wi 1 l be used, The ramp for the driveway coming off the- r' . <br /> i 1 1 have to be a phraI t due to the s Tope. <br /> Donna McMullen, abutter at Lots 34 and 35 expressed concern that there is. not i <br /> adequate distance from her well to the i-r septic system, Mr, Costa s toted= hie-. � <br /> has measured, verified and certified with the Board of Health with his name. _ <br /> and seal that there is adequate distance from the edge .of the leaching fa�c- <br /> i l i ty to where Mrs. McMullen says her well is . M Behr an stated this should',-,..-. <br /> be discussed with the Board of Health. <br /> Ms <br /> McMullen stated she i also concerned with the water qua r t �.. , .; {. .. <br /> Carol Jacobson started these lots for many years were considered unb6 ld ble� . <br /> Two copies of the modified fill plan was requested. r.y. <br /> x <br /> tet. <br /> Hearing continued until the lot is staked. Scheduled for September 25, :30'. p.M. <br /> Michael onnea me BS DC Survey) To construct a sun room addition and' ab ; .tIn . <br /> patio at Ma u s ho p Village. - Stephen Va n T 1 stood down. Edward Do n ne i t y:' p re - <br /> en t i ng . Abutters have been notified. The existing cottage is app ro c i ria-t j'y-..�°105 <br /> feet back from the top of the coastal bank. A proposed 12 x 12 sunroom on- the <br /> front of ' the cottage with a deck over a portion of the sun room. The deck w-i l ] <br /> extend 7 feet from the buffer and there will be a landscaped patio area to the <br /> southwest a t the street side. Cutters will be installed leading into d rywe l l s. <br /> Mr. Van To l stated he has recommended grading everything backwards. They w_i l l <br /> be 85-90 feet from the coastal bank and there will be a non-welling harrier in <br /> the front, <br /> set ofp l ans with the set-back noted were requested. TAKEN UNDER ADVISEMENT* <br /> E. L. Shore, (BSC/CC Surrvey) Stephen VanT l stood down. To construct a loft <br /> over the living areas of an existing cottage and patio on the northerly side <br /> at lot #1189A Maushop Village. Edward Donnelly presenting . <br /> Ms duPon t advised this cottage was only roved back 12 feet rather than to the <br /> deeded easement, or 50 feet, and is still in violation. Mr. Shore stated when <br /> he purchased the house, they received a plot plan and moved the house to where <br /> New Seabury instructed them to. They would have liked to have moved it further. <br /> Mr. Donnelly asked to hold that question in abeyance. he stated the house had <br /> been moved under previous hearings and permits, whether in accordance to those <br /> permits or not is not being stated a t this time, which i <br />