Laserfiche WebLink
i <br /> Cornrva t i on Commission <br /> Meeting of February 5, 1987 <br /> Page 4. <br /> major boat maintenance in this location would not be looked upon favorably. She <br /> asked that this be conveyed to the client . <br /> Ms . Baylog requested an indefinite continuance. <br /> CONTINUED INDEFINITELY. <br /> 8: 00 - Richard Bump (Arrow Engineering) To renovate an existing stru tuNre and <br /> construct a new attached dwelling , deck, driveway, sewage and water service at <br /> Lot 30-41 Monomoscoy Road . Bob Raymond presenting . The property is on a coastal <br /> bank in a flood zone. The proposed structure will not have a basement. 750 yards <br /> of fill will be used in the area of the septic system to conform to Title V. The <br /> closest point of the septic system to the Great River a tuary is approximately <br /> 142 feet. There is an existing cesspool which will be pumped out and removed. <br /> Where is an existing well , a handpump, inside the existing structure which will <br /> be removed also. A temporary straw bale dike is proposed. Board of Health <br /> permits are in hand. <br /> John stated he did an on-site and his only major concern was the amount of fill <br /> necessary but in speaking with the health agent learned this is necessary t <br /> comply with Title V. <br /> Concerning the foundation, Mr. Bump stated he is proposing to either lift the <br /> house off with a crane and place it somewhere, put in a foundation and put it <br /> back or jack it up and back down again . There is no basement planned. <br /> Ms Behrman questioned if the work limit of the straw bales would be adequate for <br /> maneuvering of equipment. Mr. Bump stated i t would be. Ms . Be rman stated i f <br /> any change is- contemplated, the committee mint be consulted prior to acting . <br /> Concerning revegeta t i on, the commission was advised the revegeta t i on will be <br /> with indigenous riatter. <br /> HEARING CLOSED - ORDER OF CONDITIONS WITHIN 21 DAYS . <br /> 1 - Lib el -Sol lows Development Corp. BC Survey Consultants) Lot 1 <br />' Santuit Pond Road . To construct and maintain a ' x 24 ' , L-Shaped pier, <br /> ' x 24 ' gazebo and ' x 75' elevated walkway. Andrea Langhauser presenting . <br /> The Planning Board continued the hearing last night. There was an approval <br /> on the open space subdivision itself. She stated she was not aware of the <br /> special permit until advised by John. <br /> John advised the Board of Appeals granted special permits for the dock. <br /> Ms La nghau ser advised the Planning Board made minor Chang es to the walkway. It <br /> is a 5 foot wide gravel walkway extending from the developed areas down a swale <br /> and due to the slope of the sa 1 e, the Board requested the gravel walkway b <br /> terraced using railroad ties . This will take place outside of the 100 feet <br /> bordering the vegetated wetland. Ten feet into the buffer zone is a set of <br /> steps , an elevated walkway across the buffer to the 24 x 24 gazebo, located <br /> at its closest point 8 feet from a fringe red maple sviamp which borders on <br /> San to i t Pond , The walkway goes across the red maple sviamp with an elevation <br /> of two feet above the ground , thea it is 43 feet from observed water level to <br /> the end of the 12 foot wide L-ShapedP ier. <br />