Laserfiche WebLink
a h pee Conservation Commis-Sion <br /> Meeting of May 7, 1 <br /> Page 2. <br /> There are two sets of stairs going down the bank. Two steps on the lower require <br /> replacement and one on the upper. It is proposed to put stone and plantings in <br /> the drip line from the house. There will be no change in grade and everyth i n <br /> is to be done by hand. Water level to the top of the bank is - feet. The <br /> area involved k above the ra i 1 raod retaining wa.1 1 and repairs on the wall are <br /> not expected. The bank is planted with trees and native grass . <br /> John stated the bank is very well vegeta ted and he did not see any effect on the <br /> wetland. <br /> Mr. Ferriday stated underneath the deck is presently dirt and wood chips and they <br /> wish to place gravel as a surface mulch. This area w i 1.1 not be dug out, <br /> i <br /> VOTE: Motion made and seconded to issue a negative determination to Gertrude <br /> I <br /> NEGATIVE DETERMINATION. <br /> 8: 15 Phyllis !-rappel (Four Seasons Greenhouses) Wheeler Road. Abutters receipts <br /> were presented. I t is proposed to install a greenhouse on an existing deck and <br /> add an additional 80 square feet of deck area .- This is a twelve-sided house. <br /> Pictures of the present deck area were shown which goes two-thirds around the house. <br /> I t is proposed to remove the flooring of the deck and rek •rk it. There w i l l be an <br /> open area into the mouse, nothing below the deck w311 be affected. Then 80 square <br /> feet of deck will be installed along side with an enc i t on both sides of the green- <br /> house. <br /> reen- <br /> hou e. Enter for platform t be of 8 X 10 wood frame pressure treated lumber, a <br /> 2 X 8 construction supported by 4 X 4 pressure treated posts set on aluminum bases <br /> which will then sit on sauna tubes 48 inches below a rade. Footings will be poured <br /> concrete 8 inches i nd i ame to r 48 inches b low grade. Decking will be 5 X <br /> pressure treated wood deck. All fastenings will be hot tipped and galvanized. <br /> Ra i l i rigs will be 2 X 6 pressure treated , 36 inches high. The only material to <br /> be removed i 5 that within the 8 inch concrete tubes which will be removed from <br /> the property. All work to be done by hard. The deck can be instal led without <br /> des troy i n.g a tree i n that locat ion and there w i 1 l be no damage to grass or f lowers . <br /> There- wi 1 1 be no contour chances. The building is 42 feet from the water. <br /> John advised the only d a to rbance wou 1 d be the digging of the sauna tubes which <br /> Mr. Halloran has assured can be dug i n one day and dirt carted out. He stated <br /> he did not see ars adverse impact. <br /> I t was noted there are no gutters on the building presently. Concern was expressed <br /> for the concentrated effect -of the run-off caused by the greenhouse. <br /> Mr. Coffey suggested a 55 gal l on drum placed and back-f R l led would be acceptable. <br /> CONTINUED PENDING RECEIPT of THE PLANS . IF ACCEPTABLE,, THE HEARING WILL BE <br /> CONS I DERED CLOSED. <br /> 3 - Andrew Kariotis . To re on t ruc t and maintain a previously authorized <br /> pier, ramp and float facility at to Tide Run. Mr. Kariotis presenting . This <br /> project was original l ' fi led in 1,Q80, .E. .E. #SE 43-135. The Mate, at that <br /> I . <br /> r <br /> I <br />