Laserfiche WebLink
1 <br /> Conservation Commission <br /> January 26, 1989 <br /> Page 3. <br /> backs for the wall and house shown. He will contact Dr. Herman and ask <br /> that he send a letter directly to the Commission. He stated he would <br /> prefer not to core back before the Commi sio i <br /> Mrs. Simmons stated the hearins won" t be closed unt-il the Commission <br /> has the proper plans. The Commission will review the information from <br /> the Board of Health, Building Inspector and Dr. Herman# if required, a <br /> date will be set f a new hearing or if satisfactory, the hearing <br /> will be closed <br /> UPON SATISFACTORY REVIEW OF INFORMATION TO BE CLOSED OR, IF NECESSARY, <br /> A NEW HEARING DATE TO BE SCHEDULED. <br /> ,Jeff Lovejoy/Luke Lally (Dorn Cape Engineering) to Construct a 3 <br /> bedroom dwelling with subsurface septic, garage, grovel drive, r,etain- <br /> ins walls, landscaping and deck at Lot 282 Cranberry AveD <br /> CONTINUED TO FEBRUARY 9 7: 30 p. m* <br /> : 15 Midge Lipkin (Cape & Islands Surveying) to construct and main? <br /> tain a swimming pool , hot tub, decd fence, and landscaping at <br /> Waterline Drive South. John Slavinsky presenting. Patrick Coffey stood <br /> corn for the hearing. <br /> Mr. Slavinsky advised the hot tub and deck are sone. A pool and alk- <br /> way, rather than deck, around the pool and d ywell for the pool is <br /> proposed. The fence has been moved in 10 feet* <br /> It was noted the move in was not shorn on the plan. A correct plan was <br /> presented revised 1/13/89. <br /> F Nor. Slavinsky suggested to his client they get a landscape plan done, <br /> which they did. <br /> d <br /> Mrs. Iarsters asked if there was an easement that allows the use of <br /> the land? <br /> Mr. Slavin sky stated there is a drainage easement. He advised there is <br /> an Ozone system going into the around level pool . The Board of Appeals <br /> have stated a hot tub is a structure. <br /> There were no comments from the public. <br /> HEARING CLOSED - ORDER OF CONDITIONS IN 21 DAYS, <br /> 8: 30 Norman Harway (BSC Croup) for a Determination of Applicability <br /> on a proposal to remove and replace an existing cesspool and piping at <br /> 5 Santuit Lane. Borman Hayes presented revised plans for removal and <br /> replacement of an existing cesspool system and a proposed addition <br /> above grade in the buffer. <br /> Mrs. Jacobson stated this -is not stated on the request. <br />