Laserfiche WebLink
M <br /> Conservation Commission <br /> January 2 , 1989 <br /> Page 5. - <br /> agreed <br /> . -agreed that would be possible. <br /> Mr. Pal atier started if the Commission would be satisfied with steel <br /> sheeting rather than pressure treated lumber, that could be done. <br /> Ms Behrman stated , as a Commission, she would be very unhappy to. <br /> accede to that without an en ineer' s certification as to the life span. <br /> . Palmatier stated very little water goes through here. <br /> Mrs. Simmons stated the Commission is not satisfied with the plans as <br /> presented and wants to approach the problem in a different manner with <br /> the certification of &- structural engineer. <br /> Mr. Palwatier asked for four weeks continuance. <br /> CONTINUED TO FEBRUARY23, 19 9. <br /> The license for the cranberry growers was reviewed. <br /> Motion made to accept the addendum to the cranberry license dated Il. f <br /> Joseph Burns seconded with the following changes= <br /> Paragraph 5, second line,, changing the word third to second. <br /> Paragraph 7. insert the -word immediately, i rst l ine A <br /> Mrs. Marsters seconded the specific changes <br /> VOTE= Motion passed with the specified changes. <br /> Sined by the Commission and dated 1/26/89, <br /> CERTIFICATE OF COMPLIANCE ISSUED: <br /> Colonial GasCo. ,, Route 130s <br /> David Palmer <br /> Great Oak Realty, Re-issue of original CoC dated 12/3/84* <br /> POSITIVE DETERMINATION ISSUED: o r an Harway. <br /> ORDER OF CONDITIONS: -New Seabury Corp. , Partial for Phase I , SE 3-724 <br /> Maushop Bluff. <br /> letter to be sent to the Selectmen stating the proposed more of the <br /> Conservation offices to a new location is satisfactory as long as all <br /> files are wooed also. <br /> FORWARD DEVEL PM NTf <br />