Laserfiche WebLink
Conservation Commission <br /> June 1 , 1989 <br /> Page 11 . <br /> to the Argy Corps of Engineers . <br /> Mr . Rosenberg told Mr . Franc h i that his remarks would be entered into <br /> the record . <br /> Mr, Sani ki asked if they were continuing this without a hearing subject <br /> to receipt of revised plans in the other configuration <br /> Mr. Rosenberg stated , when a revised plan i submitted ,, the Commission <br /> will thea consider the issue of whether or not the configuration shown <br /> on the revised plan is grandfathered as being in existence as of 1972 . <br /> If the revised pian , in the opinion of the Commission , accurately re- <br /> flects what was there in 1972 , they can declare that it is grandfathered . <br /> The balance of the Notice of Intent , the staircase , can thea be discussed . <br /> If it is found that it is not grandfathered , the applicant will be so <br /> notified and the Notice of Intent rejected . <br /> Mr , Sherman asked if there was to be a new Notice of Intent and Mr. <br /> Rosenberg said no . <br /> FEARING To 8E CLOSED UPON RECEIPT OF REVISED PLAN . <br /> 8 : 00 John !Morgan , Lot 3 River Road , Continued hearing . <br /> CONTINUED T UL 13 , 1989 at 8 : 00 AT THE REQUEST of THE APPLICANT. <br /> 8 : 15 Norman Sh i l I r , Lot 11 P.unkhorn Point Rd . for a 24 X -30 addition to <br /> the- first floor , irocrease in deck and 24 X 30 addition to the second floor . <br /> CONTINUED To JULY 13 , 1989 AT 8 : 15 AT THE REQUEST of THE APPLICANT. <br /> : o Charles Nirenberg for permitting of existing structures : Catch <br /> basin with drainage pipe ; low amperage electrical lines on coastal <br /> bank and approval of a revegeation plan for the bluff top at 28 <br /> Triton Way . Nancy Deli impe of Aubrey Consulting , Inc . presented <br /> abutter receipts . This filing i s in response to the Enforcement <br /> Order for cleared vegetation beyond the area allowed , power lines , <br /> catch basin and drainage pipe . It was required a plan be submitted <br /> indicating the structures on the coastal bank-, plan for removal of the <br /> catch basin and power lines and revegetation plan . Discussion between <br /> Lisa Hanscom and David Aubrey resulted in a decision that it would be <br /> unnecessary to remove the power lines , catch basin and pipe . Instead , <br /> a Notice of Intent would be filed to ask for the permitting of same <br /> and a reve etati on plan ou ld be submitted . Lisa suggested the catch <br /> basin and drain pipe u l d be more suitable than taking it out and <br /> Putting in a dry well . <br /> Jr . Rosenberg asked when the unpermitted work was done and was told <br /> it was discovered by the Conservation Commission in January or Feb- <br /> ruary . fir . Rosenberg asked if this work was done after the other <br /> Order of Conditions was issued , without permit , after the other <br /> proceedings before this Commission? <br />