Laserfiche WebLink
IV Conservation Commission <br /> June 15 , 1989 <br /> Page 1 . <br /> Mr . Burns stated it is above the revetment , not corning out f the <br /> revetment , <br /> Ms DeKi pe stated she believes it is on the top of the revetment . <br /> Mr , Rosenberg stated the plan i s not accurate and asked if she was <br /> saying this does not represent the configuration-. <br /> s Asmus stated she believes it is in the middle of the rip-rap and <br /> [fir . Burns disagreed . <br /> Ms D Kimpe stated it is 4 ft . , coming out , a black pipe . Mr . Burns <br /> added , and it is hanging above the revetment ,, not in the revetment . <br /> Ms Del ipe stated it is not fixed i n concrete . <br /> Mr . Rosenberg asked if this was New Seabury ' s land and was told it was . <br /> He continued , this is not Mr , Nirenbeg ' s land and he has installed a <br /> drain pipe a.nd we are being asked to permit it s De impe stated yes . <br /> She is sure he would be willing to have it roved over onto his actual <br /> property . <br /> Mr . Burns asked about the fence blocking the right of wary? <br /> Mrs .. Simmons stated it is out of the purview of the Commi.ssion but. he <br /> has an illegal fence up there . <br /> Mr . Rosenberg asked if they want to file a revised plan or stand on <br /> this orae? Nis DeKi mpe stated if it ' s necessary • Mr . Rosenberg stated <br /> it isn ' t a case of necessity , 'it ' s up to what she warts to do . <br /> Ms DeKimpe stated she believes they have put the drain pipe in the <br /> wrong spot. on the diagram . <br /> . <br /> 1r . Rosenberg asked if she wanted the Commission to act on this plan <br /> or does she want to file another plan . The final plan will be refer- <br /> enced in the order of Conditions . <br /> Ms Delimpe stated she will submit a reprised plan . <br /> . Coffey asked the quantity of water flowing through the pipe be <br /> submitted and the point of information that it is not low voltage <br /> wiring on the bank . He stated he is very uncomfortable with many <br /> aspects of this . The Commission should know if the catch basin <br /> has been properly installed , the pipes sealed . There is no evidence <br /> of what ' s there . If moved , that would be yet another impact . <br /> HEARING To BE CLOSED UPON RECEIPT of A REVISED PLAN . ORDER of CONDITIONS <br /> TO BE ISSUED 21 DAYS THEREAFTER . <br /> 8 :45 Robert Hansen for the construction and maintenance of- a 20 ft . <br /> 20 ft . addition to an existing dwelling ; swimming poo l and adjacent <br /> deck at 63 Keel W Susan Asmus presented reprised laps showing a <br /> dock and float rid leaching basin rather than drywel The dock is <br /> existing and is added for clarification . <br /> The requirement that plans be in the hands of the Commission one week <br /> prior was discussed . <br />