Laserfiche WebLink
Conservation Commission <br /> October 5, 1989 <br /> Page 8. <br /> 9:30 DONALD MC GOLDRICK for a Deter inaiton of Applicability for the removal <br /> of four trees at 172 Waterway. No one was present for the Dearing. Mr. <br /> Sherman advised an Enforcement order was issued when the Commission was <br /> advised by the Shellfish Warden that trees were being cut down. The <br /> Mc Goldricks live out of state. i <br /> VOTE: Motion made and seconded to issue a negative determination. <br /> A letter to be sent that no work is to be done in the buffer zone without <br /> application to the commission. <br /> NEGATIVE DETERMINATION. <br /> Board of Health setback Policy: There is a loophole that will be taken care of. <br /> Status of November Town Meeting Articles: Thirty hours for the Secretary and <br /> Chapter 40-21D will appear on the warrant. The article to ask the applicant <br /> to help with the cost of the consultant was not accepted* This can be done <br /> by petition. <br /> Wetlainds Workshop: To be put on by the Soil Conservation Service, arranged by <br /> the Mashpee River Woodlands Committee, on October 11 ; 1989. <br /> A letter from Town Counsel was read into the record re Malcolm McDonald. The <br /> surrey on John's Pond Park to be seat to doe Reardon, The town planner to be <br /> consulted concerning Bog road. <br /> CERTIFICATES of COMPLIANCE ISSUED: Ronald Mc Carthy and Stanley Hutchins, <br /> Dock Regulations: Bob Sherman and Gertrude Simmons to get together on October 12. <br /> let ter from Nancy DeK impe of Aubrey Consulting was read concerning the Nirenberg <br /> revegetat i on. <br /> 'Ms Behrman stated the plan was totally unacceptable due to the paths going to the <br /> bank. There was supposed to be a strip undisturbed as a buffer between the house <br /> and the edge of the bank, which Mr. Nirenberg mowed down. - She stated she would <br /> like to see a solid mass of vegetation there. <br /> Mr. Coffey stated he could see something at the lip where it is crucial , but not <br /> the entire landscape plana <br /> There was general agreement the commission is between a rock and hard place and <br /> it was suggested Mr. Sherman call DEP to advise thea of the situation. The <br /> Commission wants more neve etation than the original plan requires* Also, Mr. <br /> Hiren erg would have to dig out all the punts to remove the electrical work, <br /> if that, is what they rule. <br /> It was notoed the order of condition was issued duly 6, 1989 and nG attempt was <br /> Iliad o contact the Comm isv iCOk.+ Col i i1 0�i• <br /> Ms Behrman suggested haybales be staked over the right of way and winter rye with <br /> tobacco cloth can be sown as a temporary measure. <br /> Droopnick: A certificate of Compliance was requested and an Enforcement order <br /> issued. A letter was read stating they will comply with the dimensions and re- <br /> configure. <br /> e- <br /> configur . When completed, Mr. Sherman to check. <br />