My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/28/1989 CONSERVATION COMMISSION Minutes
>
12/28/1989 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:05:54 PM
Creation date
2/21/2018 1:58:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/28/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Conservation Commission <br /> December 28, 1989 <br /> Page 2. <br /> Mr. Coffey asked if the ramp began in marsh grass and was told it is just grass, <br /> not marsh grass. <br /> . Sherman suggested extending the stairs right to the stone steps. Mr. Thorng <br /> stated he had thought of that also. Mr. Coffey asked if continued, would it ex- <br /> ceed the length by law. r. Thorng stated the length is from Mean High Water <br /> which he took as the edge of the marsh. It was noted, duo to the ice, the edge <br /> of the salt marsh was not staked. <br /> . Th orng stated he had no problem with tying it in to that, nor would his client. <br /> He would have to put another post in. <br /> Ms Behrman suggested a stepdown to the foreshore to avoid erosion problems. <br /> Mr. Coffey felt the size of the fixed pier to be inappropriate with a lot of ramp. <br /> Mr. Thor•ng suggested it be downsized by 5 feet. <br /> Mr. Coffey stated he would be willing to horsetrade downsizing the proposed 5 ft. <br /> for not extending the walkway. <br /> Ms Deh r man felt more Concerned with the erosion around the walkway. <br /> Mr. Thor rig agreed to clear these items with h i s client. <br /> HEARING CLOSED - ORDER OF CONDITIONS IN 21 DAYS WITH THE ASSUMPTION THAT THE <br /> STEPS, FIXED RAIL AND DOWNSIZE BE CONDITIONED. <br /> Mr. Thorng asked to have the conditions set; new plans to be provided within <br /> two weeks. <br /> 7:45 John' s Pond Estates Association, Sunset Circle. <br /> CONTINUED TO MARCH 22, 1990 at 7:45, AT THE REQUEST OF THE APPLICANT. <br /> 7:46 James & Marilyn Walker for the proposed construction and maintenance of <br /> an elevated walkway and fixed timber pier at 184 Captain's Row. <br /> George Thorng of Arrow Engineering advised the proposed dock is exactly <br /> like the Ideon dock just reviewed. Construction will be of pressure treated <br /> wood. Existing stairway is tied i roto the proposed fixed stairway, elevation <br /> ft. above the marsh,, extending out from Mean High Water 65 ft. approximately. <br /> Total length of the structure is 90 ft. , the Tee is 30 ft. and it would be <br /> acceptable to downsize to 25 ft. with the railing on the end of the fixed pier. <br /> The Board of Appeals has approved the plan. <br /> . Sherman stated he4 had no problem with this. <br /> Mr, Somerville stated this is the same idea as neon and he would want outside <br /> docking. <br /> 1r. Coffey asked if there is any navigational impact, the river narrows in that <br /> location. <br /> Mr. Sherman stated if a Chapter 91 filing would be required, that would be their <br /> bailiwick. <br />
The URL can be used to link to this page
Your browser does not support the video tag.