Laserfiche WebLink
Public Works Bit i l di ng Committee <br /> Minutes of December B, 1984 <br /> Rage 8. <br /> Concerning carpentry, Mr. Cartier stated there is only two days work on the <br /> outside and the inside will not be ready until the studs go up. Also, the <br /> egress doors are not on the job. There i s one or two days work for one man <br /> when the studs are up. He stated he called Mandy to notify him to be ready <br /> for menday morO nq. <br /> Mr. Re asked if the di vertex valve, as required by the Beard of Health, was <br /> in the septic system. <br /> Mr* Cartier stated the di verter va.l ve is i n. A tee was missing in the septic <br /> tank and was the only exception by the Board of Health . <br /> Mr. Re- asked El 1 'I's the status of the bol is to be changed by the i ronworker. <br /> Ell is advised they have been changed but. he did not know cif the second bolt <br /> had been drilled through the wood. Mr. Cartier stated it had been done, <br /> Mr, Cartier advised he had spoken with dim Twi to of the gas company and was <br /> assured the gas- 1 i ne would be done by the end of the week. It was installed <br /> the first time, broken and repaired. It was then broken a second time. <br /> } <br /> Jack Cartier gave the 'commi ttee the name of a local resident who is interested <br /> in the excess fill ,, He stated the man would have to pair for trucking and load- <br /> ing , -or <br /> oad-ing , -or get a machine to handle i t. Ellik agreed to contact the man to deter- <br /> mine his needs <br /> In answer to a question when the power would be on, Mr. Cartier stated he <br /> called the power company earlier this week. The wiring .inspector would not <br /> approve the box the meter was to be mounted on. Mello has replaced it and <br /> they are awaiting a new inspection. He also stated heat will be available <br /> next geek. One smal l floor furnace is to go in, but they are waiting for <br /> the building to be secured. <br /> Mr Re stated a months notice should be given to Ernie vi rg i l l o when the <br /> building will be available* <br /> There was di scuss i on of the state's request to move the salt shed and Ellis <br /> stated he would strongly recommend the shed remain where it was designed to <br /> be. He would give the matter consideration. <br /> Mr, Cartier advised the committee he has a new schedule for presentation and <br /> also stated he will be looking for an extension of time. The building will <br /> be substantially complete within 5-6 weeks to rove, 2 weeks beyond that for <br /> final completion. <br /> Sam Re read a notice to the town of a law suit due to an accident between <br /> Masaschi equipment and a worker's automobile. <br /> John Wyllie agreed to meet with Joseph Reardon in the morning to request <br /> that he take care of the matter, <br />