My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/23/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
4/23/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:13:27 PM
Creation date
2/22/2018 2:15:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/23/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S <br /> i <br /> Publ i s Wo rks Bu i 1 d i ng Commi ttee <br /> Minutes of April 23, 1985 <br /> Page 2. <br /> Ellis stated he will have the areas marked off whore the asphalt is to be <br /> removed by next Saturday. The Public darks Department will remove it as <br /> soon as narked. <br /> A copy of a letter from North River Associates to Triple A was read <br /> requesting payment for the lift and air compressor in the amount of <br /> $2100. plus finance charges of $162.28. The secretary was instructed <br /> to write a letter advising their letter was referred to the architect <br /> for acts on. <br /> AnthonyFi orenti n i advised he received a call from American Engineering <br /> • a ; F <br /> & Testing inquiring if the ,lob was complete and stating the test borings <br /> for the wall have not been paid. They were referred to Ellis Laycock. <br /> Ellis informed the committee Aaron Cohen has another line of credit and <br /> Ellis feels sure the outstanding bills will be paid. <br /> Ellis presented change order 18 for accepting 2500 psi concrete in place <br /> of 3000 psi specified, a credit to owner of $1000. and change order 19 <br /> to allow polystyrene insulation for a credit to owner of $5o, <br /> VOTE: Moved and seconded to approve change order #18 for a credit of <br /> $1000. to owner to accept concrete strength of 2500 psi as pro- <br /> vided in place of 3000 psi specified. Unanimous. <br /> VOTE: Moved and seconded to approve change order #19 to allow the <br /> polystyrene insulation in the foundation for a credit to owner <br /> of $50. Unanimous. <br /> Mr. Re stated no requisition will be accepted until the job is completed. <br /> Pl a ue: <br /> Anthony Fiorentin i presented a proposal from McGann Bronze, 24" wide by <br /> 30" high - $985,00. A rubbing will be forwarded when order is received <br /> and a release is required in 15 days with a deposit for 50 of the total . <br /> The other three firms are still working up their proposals. He agreed to <br /> contact them to notify if proposals are not in the mail by Friday, they <br /> wi 11 not be considered. <br /> Blinds <br /> Mr. Fio renti n i reported Walls to Windows quoted a cost of $485,56, meas- <br /> ured and installed for blinds. A 25% deposit is required with a four <br /> week order time. After discussion of possible alternatives, it was agreed <br /> to purchase the blinds. <br /> VOTE: Moved and seconded to place an order with 'Walls to Windows for <br /> blinds in the secretarial area for $485.56. <br />
The URL can be used to link to this page
Your browser does not support the video tag.