Laserfiche WebLink
determination. The acreage is large and nitrogen loading <br /> does not enter into this. <br /> Mr. Buckley stated plants shown are being used from what is <br /> existing. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to find a negative deter- <br /> mination for Herbert Beigel, <br /> NEGATIVE E ETE +iII ANTI I. <br /> 7:30 STEPHANIE D. JONES & ROBERT ELE I G of 71 Buccaneer Way <br /> to reconstruct a hurricane damaged pier, ramp and floats in <br /> the M sh ee River. Mario DiGregorio and Paul Ryll <br /> resenting. Proposed is reconstruction of a private pier <br /> with seasonal ramp and float. The area is not mapped as <br /> haying shellfish resources. 1t '.s a 16,000 .f. lot on the <br /> east side of Mashpee River. The original float was built <br /> earls in 1970's and was larger than what is being proposed. <br /> They are not doing a walkway, only pier and floats. Pictures <br /> were shown. A filing was sent to Natural Heritage with no <br /> response to date. 1t is 49 feet from Mean High Water to the <br /> end of the second float, Soundings were taken at low tide; <br /> it is a shallow area, 1 . 7 feet at Mean Low, 1 . 2 feet at dead <br /> low. The only boats used are a canoe and a sailboat with <br /> removable centerboard, human powered vessels. <br /> Abutter notification receipts were provided. <br /> Mr. DiGregorio advised construction will be by hand working <br /> off each completed section of the pier. The original float � <br /> was 220 s.f. ; now, it will be under the 200 s.f. (136 s.f. . <br /> When the floats and ramp come out, the pipe piles will be <br /> removed also and placed in winter storage. Theme are no eel <br /> grass beds in the proximity of the floats , <br /> Mr. Sherman questioned access per Chapter 1 r, <br /> DiGregorio stated there will be a sign posted, if they cannot <br /> elevate to 5 feet., that the ower allows foot traffic u <br /> around the end of the pier. <br /> Mr. Ryll advised there is 3 feet of clearance between the end <br /> and the retaining wall and there is not much traffic. <br /> Mr. Sherman stated is above the salt mare. <br /> Mr. Johansen asked if they had filed with Board of Appeals"? <br /> Mr. Diregorio stated it was not necessary in this case. <br /> Mr. Sherman stated he will have to speak to the Building <br /> Inspector and get a sign-off. <br /> Mr. Fitzsimmons asked if maintenance was requested. They <br /> would like to have this. He asked about pilings# Mr. <br /> i Sherman stated it can be conditioned that when pilings are <br /> replaced, they will be elevatedS <br />