Laserfiche WebLink
5 <br /> Mr. Sherman stated they have a letter of support from Rick <br /> York. <br /> It was noted the vessels using the structure will be one 20 <br /> ft. boat and one 13 ft. boat. Mr. Sherman asked for written <br /> confirmation of the boats. <br /> Mr, Desrosiers asked the method for securing the gazebo* <br /> Nor. Sherman stated that can be conditioned, <br /> Mr. Desrosiers asked if there was no problem with Board of <br /> Appeals? Mr, Borselli will submit ars application <br /> immediately. <br /> Mr, Sherman stated the Commission cannot issue until they <br /> have approval of Beard of Appeals. <br /> Mrs. Ferriday asked if maintenance was requested, Mr. <br /> Wightman stated he wants to replace pilings if they come up. <br /> The commission would have to be notified and would reserve <br /> the right to impose conditions* <br /> Mrs. Ferriday requested details of the tie-down for the <br /> gazebo. Mr. Borselli agreed. <br /> Public comments: none. <br /> VOTE: Motion made -and seconded to close pending vessel <br /> information, details of the tie-down and action <br /> by Board of Appeals. <br /> CLOSED PENDING. <br /> PAULINA ROBINSON for bank stabilization and <br /> revegetation at 27 Birchway, <br /> Mr. Sherman told Mrs. Robinson it was not necessary for her <br /> to attend, This was an enforcement matter going on for <br /> long time. The plans are what he has developed with her. <br /> "here is tree removal and dumping of the bank. There is an <br /> existing stairway. Shading will be planted and old fill <br /> removed. At the bottom of the bank there are details showing <br /> - 6 x 6 landscape timbers secured with pipes and an area of <br /> jute netting and straw mixed with winterberry, bearberry and <br /> low growing junipers. The order of conditions will be <br /> monitored carefully. An Enforcement order will be issued <br /> with the order of Conditions that it is not optional, it must <br /> be done. <br /> Mr, Johansen advised there is no DFP number and no proof of <br /> mailing to Natural Heritage. <br /> Mr. Green asked if three timbers are going to be adequate? <br /> Mr. Sherman did not want to dick into the hill for deadmen. <br /> There is some root structure. <br /> Mr, ] esroiers asked if they are placed at Mean Annual Flood <br /> Level? Mr. Sherman stated no, it is below it. He will make <br /> j sure at the pre-construction on-site that it is above. <br />