My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/22/1996 CONSERVATION COMMISSION Minutes
>
8/22/1996 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:25:19 PM
Creation date
2/23/2018 2:15:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/22/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22 August 1996 <br /> Page 6. <br /> CLOSED PENDING. <br /> :10 PAUL E., KEON,T, 136 Capt ins Row, continued from 8 August. 1996. <br /> Jack Landers-Cauley presenting. The project is the rang of the dweng and <br /> replacement in the same footprint with a two car garage. Revised plan <br /> submitted. A Bio-Clere system is proposed for the septic. <br /> Mr. Sherman stated a revision date is needed on the plan. He went there and <br /> does not disagree with the Top of Bank but on the plan and in the field do not <br /> agree. He would recommend getting a plan with an adjusted Top of Bank and <br /> revision slate on the plan. The BVW line must be verified. Number of <br /> bedrooms is four. It is less with this system than 3 bedrooms without. <br /> Public comments: none. <br /> Mr. Sherman stated the Order cannot be issued for 39 days pending <br /> comments from Natural Heritage. <br /> VOTE: lotion made and seconded to close subject to passage of time for <br /> receiving notice from Natural Heritage and revised plan after <br /> conference with the agent and engineer. Unanimous Note. <br /> CLOSE PENDING. <br /> 6:20 MICHAEL L. STEER, 25 Tide Run, continued from 25 July 1996. Mr. <br /> Sherman stated this would be the second continuance for lack of plan. <br /> VOTE: Motion made and seconded to find a Positive Determination unless <br /> the applicant agrees to a continuance. Unanimous Vote. <br /> CONTINUED TO 5 SEPTEMBER 1996 AT 6:00 P.M. <br /> 8:25 JAMIE REGAN, 16 Brookside ale, continued from 8.August 1996. <br /> Mr. Sherman advised he talked with Mr. Regan about this. In the first Order <br /> of Conditions there was a mistake re the work limit. They did refine the area <br /> There the work hmit would be. It still gives 59 feet at the shortest point. It is <br /> a compromise. <br /> Concerning the lawn issue, he would be getting 314 of the lawn he was as .ng <br /> for. Information to be provided on the grass seen. <br /> Mr. Sherman stated the Commission could accept the concept of the lawn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.