My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/1996 CONSERVATION COMMISSION Minutes
>
11/21/1996 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:09:13 PM
Creation date
2/23/2018 2:20:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/21/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
21. November er 199 6 <br /> Page 3. <br /> N r. Rosenberg stated if Board of health and. the State approved the system, <br /> the Commission does not have the right to say otherwise. <br /> Mr. Lupo stated he would assume the Commission has jurisdiction over <br /> ground water. <br /> Ms Wilson stated if in fact the Commission is going to walk down this path, <br /> they should consider a conditions concerning landscaping plans. Mr. <br /> Rosenberg stated there is no authority to do that. Ms Wilson stated. DEP <br /> would uphold this. <br /> Mr. Sherman stated there w l be a pre-work on-site with the contractor and <br /> everything will be made clear to him. <br /> Ms Wilson stated there is a 3 ft. differential. Mr. Sherman stated if there is a <br /> flawed plan, it is not up to the Commission to correct it. <br /> VOTE: Motion made and seconded to close with the condition there wiR he no <br /> grade changes and no landscaping other than ghat is shown on the <br /> plan. Unanimous Vote. <br /> HEARING CLOSED. <br /> 7:40 o WT OF MASHP E, BOARD OF SELECTMEN, for maintenance <br /> dredging of an e3dsting channel in Wuit Bay 800 ft. x 100 ft. and beach <br /> nourishing 250cubic yards on Great Neck, on the Commonwealth of <br /> Massachusetts Environmental Management Dept. of Forest & Parrs property <br /> within the Whit Bay area of Critical Environmental Concern. Norman <br /> Hayes presenting. <br /> Mr. Sherman stated the project can he approved with dine tuning. There will <br /> he an additional pre-wort on-site. Limits where nourishment will he put will <br /> he delineated in the fad. <br /> Mr. Hayes advised this was dredged in 1986 under an Army Corps permit. <br /> They dug 2500 c.y. within the channel and put it on Seconet. There was a <br /> change in ownership so they will be going along the beach in Great Neck. It is <br /> above Mean High Water, 2 feet on the coastal. hank. Asked how the dredge <br /> material will he transported., he stated by hydraulic pipe, moved. around. I <br /> will improve storm protection. <br /> statement wall he forthcoming from the Shellfish Warden. <br />
The URL can be used to link to this page
Your browser does not support the video tag.