My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2000 WATERWAYS COMMISSION Minutes
>
12/05/2000 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2018 10:17:45 AM
Creation date
2/26/2018 1:31:13 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/05/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The scope of the Pirates Cove Association project <br /> was to make the beaches more available to the <br /> public. To achieve that goal, they wanted to <br /> clear away the front of the beach and refill it <br /> with new sand. These permits were granted in <br /> three separate areas . One was in Orsini Beach, a <br /> second was the area known as beach "c, " and the <br /> third was almost at the mouth of the river and <br /> known as beach "b. " <br /> Jim asked if there was anything mentioned in these <br /> grants about navigation to which Paul responded <br /> that he did not think so. Jim replied that we <br /> would pass this information onto Leslie Fields of <br /> the Woods Hole Group to assist in the work that <br /> they are doing for us pertaining to the dredging <br /> of the Mashpee River. <br /> Jim Hanks reported that he has received the after <br /> dredge report from Wayne Jaedtke. This- report <br /> states that 2, 800 cubic yards were removed from <br /> Little/Great River. Mr. Jaedtke also submitted a <br /> bill for $13, 026. 65 which was slightly over what <br /> we anticipated. He has also prepared a before <br /> dredging survey of Popponesset Bay. <br /> Jim put together a spreadsheet showing the amount <br /> of money that we have, less the 13, 000; we can <br /> dredge approximately 5200 yards in the Popponesset <br /> Bay area. <br /> Jim also distributed to commission members the <br /> "Mashpee River Dredging Project" handout showing <br /> cubic yards, average depth, cost, etc. Jim led an <br /> extended discussion on the subject of the dredging <br /> project handout. <br /> Also handed out at this time was the Woods Hole <br /> Progress Report from Leslie Fields. <br /> Jim Hanks discussed with Mr. Jaedtke targeting <br /> specific areas to clean out in the amount that we <br /> could afford the next time that he conducts the <br /> bathymetry survey. <br /> John' s Pond Issues <br />
The URL can be used to link to this page
Your browser does not support the video tag.