My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/18/1997 CONSERVATION COMMISSION Minutes
>
09/18/1997 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:34:47 PM
Creation date
2/26/2018 1:58:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 September 199 <br /> Page 8. <br /> Mr. Rosenberg asked how far is the deck? Mr. Sherman stated it is a net gain <br /> of to feet. <br /> Mr. Johansen stated the whole lot is in the ACEC <br /> MIs Terrio stated at the top of the coastal bank there is an encroachment. <br /> Most areas only have wood chips* A planting plan was provided by AU <br /> Leblanc. From the deck to the hay hale line is all wood chips. It is proposed <br /> to reveetate the whole area. A concern is with the cinnamon fern, it may be <br /> too dry in Haat area. The coastal bank is very weR vegetated. <br /> Nr. Sherman stated the coastal bank starts and stops and should be shown <br /> on a plan. Mr. Slavinsky agreed. <br /> Mr. Green asked that the ACE C be shown on the plan. Mix. Slavinsy agreed. <br /> Mr. Leblanc advised the railroad ties are in rough shape, He is taming about <br /> changing these. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to close pending receipt of DEP number, <br /> the ACEC being shown on the plan, a meeting with the agent and <br /> landscaper to define and review the new area where ties are to go <br /> and re-demotion of the top of the bank with John Slavinsly. <br /> Unanimous Vote. <br /> CLOSED PENDINGo <br /> :40 PETER GOVONI for construction of a dwe ing, garage, bituminous <br /> driveway, water service, stone wall and swimming pool at 113 Janes Circle. <br /> Dave Sanicki presenting. It is a four bedroom house with garage, septic and <br /> pool, all within loo feet of Johns Pond. This lot is a deep slope 61..6 at the <br /> drive, 26 at the pons edge. <br /> Ms Terrio stated the BVW was not located on the plan and a pepper hush <br /> also. The pian wiu accommodate the 50 foot buffer by moving the house back <br /> about 5 feet. There is also the issue of top of bank. This can be discussed in <br /> the field. The corner of the septic is in the Com ssion�s jurisdiction. Mir. <br /> Sanicki stated this can be moved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.