Laserfiche WebLink
i <br /> 23 October 1997 <br /> Page 2. <br /> Mr. Fitzsimmons suggested trying to find some way to accept it and not take <br /> it out. <br /> Mr. Hayes will provide a probe and then a decision will be made. <br /> Nor. Sherman stated they cannot armor a bank if it is a sediment source <br /> unless there is a house present. <br /> Mr. Desrosiers stated he is not sure armoring is putting . a couple of steps. <br /> Mr. Sherman stated to approve this would be setting a precedent and it is in <br /> opposition to the regs. <br /> Mr. Green agreed with Mr. Hayes, to take the Commission out of the loop. <br /> Aft. Iesrosiers felt this is in the best interest of the public. He uses that <br /> extensively himself. <br /> Mr. Sherman was not ting about removing the stairs. Mr. Desrosiers <br /> stated if the blocks at the bottom are moved, a storm will wash out the sand. <br /> Mr. Rosenberg suggested taking the stones out, put in sand and nourish every <br /> year. <br /> Mr. Green would like to see the numbers where the A Zone comes in. Mr. <br /> Fitzsimmons did not want to remove what is there. <br /> Mr. Sherman stated what is there would have to be legalised but the <br /> stonework cannot be leged. <br /> Mr. Hayes will try to have the information to the Board by next week. The <br /> crib will be sitting right at 1. . <br /> 7:10 TOWN OF 1 ASI PEE HARBORMASTER to amend the Order of <br /> Conditions for SE 3-1565 to permit the addition of two shellfish seed tams <br /> north of the upland end of the walkway at 88 Sconett Island load. lick <br /> York was present. A draft plan was presented and, if approved, wig. be <br /> redrawn by Cape & Islands Engineering. Proposed is an 5' x 8" and ' x 10, <br /> tank and 2 inch ire-take line. <br /> Mr. Sherman had no conceptual problem but one of the pipes has to go under <br /> the salt marsh. Mr. Green asked how it will be installed? It can be driven <br /> with a well driller. liar. Sharpe asked how deep? 1t will be 2-3 feet. <br />