My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/8/1998 CONSERVATION COMMISSION Minutes
>
1/8/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:04:55 PM
Creation date
2/26/2018 2:17:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/08/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> January 1998 <br /> Page 9. <br /> New se bury: Concerning the regional erosion control project, an ENP is <br /> required. Materials were distributed, including CZM and Mass. Natural <br /> Heritage comments. <br /> Mr. Sherman advised this project might fold under the financial weight of it. <br /> MACC: Convention information for March 7 and workshopire-ups were <br /> distributed. They should be returned for submission to MACC prior to <br /> February. <br /> Stent ear : Mr. Sherman advised he went to the site with Mr. stenberes <br /> surrogate. They looked at sites for a parking lot with a gate. A fax was sent <br /> to his attorney. <br /> Mr. Sherman suggested letting him keep his gate, put a small parking lot on <br /> Great beck load, visible from the street. A path could be made and a bench <br /> placed to allow enjoyment of the vista. Mr. Stenberg would be willing to pay <br /> for the parking lot and the path. The bank belongs to the Comrrdssion and <br /> has some erosion that will need work at some point. <br /> Mr. Fitzsimmons mons asked if there are hiring trails? 11r. Sherman stated no, but <br /> they would be put in at some point. <br /> VOTE: Motion made and seconded to approve this concept, <br /> Unanimous Vote. <br /> Mashpee Marketplace: A plan provided sho�ng another parcel on the <br /> Childs liver where mitigation will be done. Mr. Sherman stated it is a more <br /> important parcel than the original. <br /> Easement model: MACC model to be adopted by the Commission. <br /> Dion: g was made with the Commission previously and the plan was <br /> deemed inadequate as the dock length was wrong. A positive determination <br /> was made. They are trying to get an Interim Amnesty permit agauin. The <br /> .gent advised he is sending a letter to IEP waterways. <br /> The Chairman asked if a copy was sera to Mr. Yon Glx, Sherman stated he <br /> would be notified by DEP. The Commission was in agreement with the letter <br /> being seat. <br /> Trout Unlimited: They are volunteering to clean up the Mashpee River. <br /> They have also agreed to get volunteers on February 7thto put in the gabions <br />
The URL can be used to link to this page
Your browser does not support the video tag.